Select how the production orders are chosen.
Allowed values
- By Order
- By Group
Backflush Materials and Hours (tisfc0220m000)Use this session to manually backflush material and hours. You can manually backflush material and hours for production orders with operations. However, you can also backflush material for production orders without operations.
Selection Range Selection Select how the production orders are chosen. Allowed values
Site A business location of an enterprise that can maintain its own logistical data. It includes a collection of warehouses, departments and assembly lines at the same location. Sites are used to model the supply chain in a multisite environment. These restrictions apply to sites:
You can link a site to an enterprise unit or an enterprise unit to a site. If an enterprise unit is linked to a site, the entities of the site belong to the enterprise unit. Conversely, if a site is linked to an enterprise unit, the entities of the enterprise unit belong to the site. Production Order An order to produce a specified quantity of an item on a specified delivery date. Project (PCS) A collection of manufacturing and purchasing actions that are performed for a particular customer order. A project is initiated to plan and coordinate the production of the to be manufactured items. For a standard-to-order production, the project is only used to link the item with the customer order. A project can also include these:
Work Center A work center, linked to a work center, that is used to calculate the end item unit costs, WIP transfers, and production results used to hold the financial transactions related to production orders. The link between a costing work center, and a work center enables you to replan production order operations again. If required, you can change the work center that is used to carry out an operation without modifying the costing process. Scheduling Area A physical area or part of the production line for which a production schedule is defined. Scheduling areas are defined for repetitive items. Planner The logon code of the employee who plans plan items. Settings Selection Method The way this session's Operation field is used to select operations for which materials or hours must be backflushed. Operation The operation for which materials or hours are backflushed. Note If the Selection Method field is All Operations, you cannot enter an operation in this field. Completed Operations Only If this check box is selected, LN backflushes an operation only if its operation status is Completed. Backflush Date The date when the materials are issued and the hours are accounted. Allowed values Enter either the present date and time, or a date and time in the past. Default value The default is the current date. Backflush Sequence The sequence in which LN backflushes material for production orders:
Grouping Selection Production Order Group Enter the JSC order group containing the production orders whose hours and materials you want to backflush.
Backflush Backflush assembly parts and hours. Related topics
| |||