Production Orders by Block (tisfc0152m000)

Use this session to view and maintain the set of production orders that belong to a order block. You can use this session also to split an order block into two order blocks or remove a production order from an order block.

After you deleted the last production order in an order block, LN deletes the order block automatically.

 

Site

The site ID.

Note

Only visible if multisite functionality is active.

Related topics

Machine

The machine on which the order block's production orders are produced.

Start Date of Order Block Period

The start date of the order-block period is the date that you entered in the Start Date of Order Block Period field in the Generate Order Block Planning (tisfc0251m000) session.

For more information, refer to the Help of the Start Date of Order Block Period field in the Generate Order Block Planning (tisfc0251m000) session.

Block Sequence Number

The value of the Block Sequence Number field determines the order in which LN executes the order blocks.

Together, the Machine field, Start Date of Order Block Period field, and the Block Sequence Number field uniquely identify an order block.

Start Time

The start time of the execution of this order block. More specific, the time when this order block's machine starts work on the first production order of this order block.

End Time

The end time of the execution of this order block. More specific, the time when this order block's machine stops working on the last production order of this order block.

Original PlannedFinish Date

The original value of the relevant operation's planned finish date.

At the time when LN retrieves an operation for a production order from the routing definition, LN also calculates the planned finish date.

The Original PlannedFinish Date field displays the original value of the SU+Run (Next Oper.) field in the Production Planning (tisfc0110m000) session.

For more information, refer to the Help of the SU+Run (Next Oper.) or Requested Delivery Date field.

Production Order

An order to produce a specified quantity of an item on a specified delivery date.

Production Order Item

The main item of the production order.

Quantity Ordered

The quantity to be produced by the production order.

Inventory Unit

The physical quantity in which an item or good is managed. For example, a quantity of wood can be expressed as a length by using the unit of one meter, or as a volume by using the unit of one cubic meter.

Operation

The operation based on which this production order was included in the order block.

This operation's machine must be the machine of the order block.

If the production order has more than one operation for the same machine, mixed with operations on other machines, the order-block functionality takes only the first of these operations into account.

If the production order has multiple consecutive operations for the same machine, the order-block functionality uses the total of the run times of these operations.

Operation Status
Current Setup + RunStart Date

The date and time on which LN plans to start the production time.

The Current Setup + RunStart Date field displays the current value of the Setup+Run Start Date field in the Production Planning (tisfc0110m000) session. The Current Setup + RunStart Date field does not reflect changes in the order blocks, until you update the standard production planning data.

For more information, refer to the Help of the Setup+Run Start Date field.

Current WaitStart Date

The date and time on which the setup and run time of the operation are planned to finish, and the wait time is planned to start.

The Current WaitStart Date field displays the current value of the Wait Start Date field in the Production Planning (tisfc0110m000) session. The Current WaitStart Date field does not reflect changes in the order blocks, until you update the standard production planning data.

For more information, refer to the Help of the Wait field in the Production Planning (tisfc0110m000) session, on the Planning Related tab, under Start Date.

 

Split Block

Creates a new order block that contains all production orders after the currently selected production order. The current order block retains the range of production orders from the first production order through the production order you selected.

Split and Close

Creates a new order block that contains all production orders after the currently selected production order. The current order block retains the range of production orders from the first production order through the production order you selected. If no errors occurred, LN then closes the session.

Update Standard Planning

Updates start times and end times displayed in the Production Planning (tisfc0110m000) session.

Production Order

Starts the Production Order (tisfc0101m100) session and displays the details of the selected production order.

Setup Classes and States

Starts the Setup Classes and States by Operation (tisfc0133m000) session and displays the operation's setup classes and setup states.

Print Order Block Planning

Starts the Print Order Block Planning (tisfc0451m000) session.

Add Production Order to Order Block

Starts the Add Production Order to Order Block (tisfc0252m000) session.