Enter the code of the standard item for which you want to copy the product structure to a project. This code must have been predefined in the Items (tcibd0501m000) session.
Copy Standard Product Structure to Customized Structure (tipcs2230m000)Use this session to copy a standard product structure, to a customized structure to support the project engineering for customer order-related customized production. Note If a standard structure is copied to a customized structure, the Customized check box in the Items (tcibd0501m000) session is selected.
Standard Item Enter the code of the standard item for which you want to copy the product structure to a project. This code must have been predefined in the Items (tcibd0501m000) session. Copy only components valid for Effectivity Unit A reference number, for example a sales order line or a project deliverable line, that is used to model deviations for a unit effective item. Customized Item Enter the code of the customized item to which the standard item must be copied. Description The description of the target item. Use Reference Date of the Project If this check box is selected, the reference date field is disabled as the reference date is derived from the source project. If the source project does not have a reference date, LN will select the system time. Copy only components valid for Effectivity Unit The date in this field determines that only those parts of the project structure are copied that are valid on the date specified. Copy Method for Product Structure In this field you can choose to copy the entire product structure or only its first level, or to make the copying process interactive. Copy Method for Items Using this field, you can define whether to copy only standard-to-order items, both standard-to-order items and anonymously manufactured items, or all items. Copy all components and all effectivity statements If this check box is selected, unit effectivity is copied from a standard product structure to a customized structure. You can fill in the unit for which you want to copy unit effectivity. Exceptions are copied for routings and routing operations that fulfill the date effectivity conditions. Copy E-Item Relationships If this check box is selected, the E-item relationships are copied to the customized structure. Alternative Material If this check box is selected, the alternative materials of the BOM components are copied as well. If this check box is cleared, the copying process ignores the alternative materials. Use Up Material If this check box is selected, the use-up materials of the BOM components are copied as well. If this check box is cleared, the copying process ignores the use-up materials. Generate New Item Codes when Customized Item exists LN generates a new item code when a customized item is filled in. Ask before Generating New Item Code Whenever a new item code is generated, LN will ask you to confirm this action. Approve Conversion Factors If this check box is selected, LN approves the conversion factors for the item. Copy Testing Combinations If this check box is selected, option combinations used for testing are copied along with the item.
Copy Copies the selected range.
| |||