Production Model Reject SetupThe repair tab of a production model contains the information required to manage rejected product in the production model. Step 1. Specify order plan quantity and lead time If the Repair Process check box in the Repetitive Manufacturing Parameters (tirpt0100m000) session is selected, you can select a repair cell from the Repair Cells (tirpt0140m100) session. Step 2. Specify the repair lead time Specify the lead time for the selected repair cell. Note: The repair lead time is only applicable when the Repair Process check box is selected in the Repetitive Manufacturing Parameters (tirpt0100m000) session. Step 3. Specify the quarantine warehouse and location Select the warehouse in which the quarantined items are stored using the Warehouses (whwmd2500m000) session. The designation of the quarantine warehouse is defaulted from the Receiving Warehouse field, but does not have to be the same. Unless you manually specify a different warehouse for quarantine the receiving warehouse is also used for quarantine. The quarantine location is a part of the warehouse, defined in the Warehouses (whwmd2500m000) session, specifically assigned to store quarantined items.
| |||