| Checking Use-up Material DefinitionsIn the Use Up and Alternative Materials (tibom0150m000) session you can checks the items,
according to the following procedure: - LN identifies the items that are part of the item range you entered and
that are defined as a material of a bill of material (BOM) in the Bill of Material (tibom1110m000) session.
- From these items, LN selects the items for which the Planner field in the Item - Ordering (tcibd2100m000) session names a planner that is part of the range of shop floor planners that you entered.
- From these items, LN selects the items for which a date is
recorded in the Last Allowed Order Date field. (These items have been
phased out or will be phased out).
- For each of these items, LN checks if the last
allowed order date is not before the date in the Expiry Date field of the BOM line.
- If the last allowed order date is before the expiry date, LN checks if the BOM line
has any alternative materials.
- If the last allowed order date is before the expiry date and no
alternative materials are present for a BOM line, the BOM line is specified in
an error report.
| |