Using QM for manufacturing operationsQuality control of operations If you use Quality for operations in the Job Shop Control module, LN creates inspection orders for each operation. These inspection orders specify the tests for the subassemblies produced. You can choose between four methods which determine the interactions between the Job Shop Control module and Quality with respect to the routing operations:
Consequences for reporting completed The chosen method determines the use of the following fields in the Report Operations Completed (tisfc0130m000) session:
You must enter the data in the Quantity Completed field and the Rejected field, except when you chose method C or D (as mentioned before). If the subassemblies must be inspected before reporting quantities complete or rejected (method C and D), the following happens:
If you apply method C, you can still modify the Quantity Completed field and Rejected field, after you close the inspection order. Note If you chose method A, and you try to change the quantities completed or rejected, after you closed the inspection order, LN will ask you if the inspection order must be reopened. If you chose method B, C, or D, and you try to change the quantities completed or rejected, after you closed the inspection order, LN will generate a new inspection order.
| |||