| Possible valuesNew When a tool is entered in LN, the tool is assigned
the New status. Available The status must be Available if the tool is to be allocated to a production
order or a service order. A multipiece tool can only be Available if at least one component is assigned to the
tool in the Tool Components (titrp0506m000) session. You can only change the status of
a multipiece tool to Available if the components have the Allocated status, the In Refurbishing status, or the Available status. You cannot change the Available status of the tool if the tool has the usage
status: - Requested
- In Use
- Returned
Blocked Tools with the Blocked status cannot be planned or issued to a production
order or a service order. You can only manually set the status of a tool to Blocked in the Tool Numbers (titrp0102m000) session. If the tool has the Blocked status, the tool is not considered when: - Planning new estimated requirements.
- Performing the availability check for tools.
You cannot modify the status of a component of a multipiece
from Available to Blocked if a second component with one of the following
statuses is assigned to the multipiece tool: - Available status.
- Allocated status.
- In Refurbishing status.
Allocated The Allocated status is assigned to a tool when it is
requested by means of the Request and Return Tools (titrp0215m000) session. When the tool is returned by means of
the Request and Return Tools (titrp0215m000) session, the status changes to Available. In Refurbishing The In Refurbishing status is assigned to a tool when the tool is requested
to be refurbished by means of the Request and Return Tools (titrp0215m000) session. Tools with this status will not be
planned for issue to a production order or a service order within the planned
period of maintenance. The tool status changes from In Refurbishing to Available if the tool is returned using the Request and Return Tools (titrp0215m000) session.
| |