The site ID.
Only visible if multisite functionality is active.
Estimated Material Distribution (ticst0508m000)Use this session to to view the amounts that are used to create financial transactions related to subcontracting WIP when subassemblies are received in inventory at estimated cost. Note
Production Order An order to produce a specified quantity of an item on a specified delivery date. Status The status of the production order. Allowed values Position The position number that identifies the estimated material in the Estimated Materials (ticst0101m000) session. Item The item that is used as material in production. Rework Order If this check box is selected, the production order is a rework order. The rework order can have one of these origins:
Estimated Costs Are Frozen If this check box is selected, the estimated end item unit costs have been frozen, which means they can no longer be modified. The moment the estimated end item unit costs are frozen depends on the Moment Freezing Estimates field. Estimated Quantity The estimated material quantity for the entire production order. Backflushing If this check box is selected, the materials for the production order are issued through backflushing. Default value The default for this field is the Backflush Materials field in the Estimated Materials (ticst0101m000) session. Serialized items Serialized items can only be backflushed if in the Items - Warehousing (whwmd4500m000) details session the Serials in Inventory check box is cleared, and the Register Lot Issue During As Built field in the Item - Warehousing (whwmd4600m000) session is Yes. In all other cases, serialized items cannot be backflushed. If the serialized item is lot-controlled, the lot from which the items are backflushed is based on the outbound method ( Last In First Out (LIFO), First In First Out (FIFO)) as is defined in the Items - Warehousing (whwmd4500m000) details session. . Unit Series A range of sequence numbers that is linked to an end item and represents one or more effectivity units. An effectivity series consists of a unit series code, a from-sequence number, and a to-sequence number. An effectivity series is identified by the unit series code and the from-sequence number. You can link one or more effectivity units to a combination of end item, unit series code, and from-sequence number. An effectivity series is identified by the unit series code and the from-sequence number. You can link one or more effectivity units to a combination of end item, unit series code, and from-sequence number. Distribution Type The distribution type for the materials to be issued. Allowed values Distribution Line The distribution line number related to the peg. Project A collection of manufacturing and purchasing actions that are performed for a particular customer order. A project is initiated to plan and coordinate the production of the to be manufactured items. For a standard-to-order production, the project is only used to link the item with the customer order. A project can also include these:
Element Activity Project Peg Origin The origin of the project peg for the production order. Allowed values Effectivity Unit A means to control the validity of variations by effectivity units. Unit effectivity enables you to model changes for the following entities:
Unit Sequence The sequence number of the effectivity unit. Net Quantity Scrap Quantity The scrap quantity of the material. Estimated Quantity The estimated material quantity. Note The sum of all the estimated material quantities by effectivity unit must equal the estimated material quantity for the entire production order. Split-Off Distribution Line If this check box is selected, the distribution line was split off. This line is stored for reference purposes only. For example, in case you want to send back project-pegged materials that were issued before splitting the order. Note A split off distribution line can contain an actual quantity of material if it is issued before performing the order split. A split off distribution line is visible only when the Hide Split-Off Distribution Lines command is not marked.
Production Warehouse Orders Starts the Production Warehouse Orders (timfc0101m000) session. Next Level Requirements Starts the Next Level Requirements (cprrp0541m100) session. Top Demand Order References Starts the Top Demand Order References (cprrp0541m200) session. Hide Split-Off Distribution Lines If this command is marked, split off distribution lines are not shown in this session.
| |||