| Effective Assembly Line Surcharge (ticpr3150m000)Use this session to display the item
surcharges by assembly line that are effective when calculating the assembly
costs. The effective assembly line surcharges are displayed in this session
after running the Actualize Assembly Line Surcharges (ticpr2280m000) session. In the Effective Date field the date is displayed on which the assembly line surcharges are
actualized. Surcharges are extra
costs in an item's standard cost or valuation price, for example, handling
costs or inspection costs. A surcharge serves as a discount if the amount or
percentage entered is a negative value. Assembly Line A set of consecutive line stations in which FAS (Final Assembly
Schedule) items are manufactured. The items are manufactured by passing the
items from line station to line station and by carrying out operations at each
line station. An assembly line is subdivided into a number of line segments
separated by buffers. An assembly line can be either a main line or a supplying
line. Generic Item The generic item or manufactured item for which the Default Supply Source is Assembly. Effective Date The date and time on which the assembly line surcharges were
actualized in the Actualize Assembly Line Surcharges (ticpr2280m000) session. Sequence Number The number that identifies a data record or a step in a
sequence of activities. Sequence numbers are used in many contexts. Usually LN generates the sequence
number for the next item or step. Depending on the context, you can overwrite
this number. Description The description of the assembly line's surcharge. Item Costing Currency The currency in which the surcharge is expressed. Surcharge Method The method of calculating the surcharge for the assembly line. If the method is Selective (Total Costs) or Selective (Added Costs), a surcharge base is defined in the Assembly Line Surcharge Bases (ticpr1190m000) session to which the calculation
applies. Surcharge Amount The surcharge expressed as an amount. An amount is entered in
this field if the Surcharge Method field is Fixed Amount. Surcharge Percentage The surcharge expressed as a percentage. A surcharge percentage is entered in this field if the Surcharge Method field has one of the following values: - of Total Costs
- of Added Costs
- Selective (Added Costs)
- Selective (Total Costs)
Cost Component The cost component to which the
assembly line's surcharge is linked. Variable Cost Specifies whether the project surcharges are variable or fixed. If this check box is selected, the surcharge is
considered a variable cost. Otherwise, it is considered a fixed cost. Note Fixed costs are only
included in the standard cost of a project if the Include Fixed Costs in Project Valuation parameter is selected. | |