| Assembly Line Surcharges (ticpr1180m000)Use this session to define surcharges for an
assembly line. Assembly Line A set of consecutive line stations in which FAS (Final Assembly
Schedule) items are manufactured. The items are manufactured by passing the
items from line station to line station and by carrying out operations at each
line station. An assembly line is subdivided into a number of line segments
separated by buffers. An assembly line can be either a main line or a supplying
line. Item The generic item or manufactured item for which the Default Supply Source is Assembly. Sequence Number The number that identifies a data record or a step in a
sequence of activities. Sequence numbers are used in many contexts. Usually LN generates the sequence
number for the next item or step. Depending on the context, you can overwrite
this number. Description The description of the assembly line's surcharge. Currency The currency in which the surcharges are expressed. The usage
of this field depends on the currency system that is set in the Companies (tcemm1170m000) session. - Dependent: You can only
access this field if your company's currency system is Dependent. You can enter
any currency in this field to express the standard cost.
- Independent: If your
company's currency system is Independent, you
cannot access this field. However, you can select the home currencies Currency, Currency, or Currency by clicking View Other Currencies. The default currency in this field is the reference
currency that you defined in the Companies (tcemm1170m000) session.
- Single:
If your company's currency system is Single,
you cannot access this field. The standard cost currency is the Currency,
which is displayed in this field.
Surcharge Method The method of calculating the surcharge for the assembly line. If you select Selective (Total Costs) or Selective (Added Costs), you must define the surcharge base to which the
calculation applies in the Assembly Line Surcharge Bases (ticpr1190m000) session. Surcharge Percentage The surcharge expressed as a percentage. You can enter a surcharge percentage in this field, if the Surcharge Method field has one of the following values: - of Total Costs
- of Added Costs
- Selective (Total Costs)
- Selective (Total Costs)
Surcharges are extra
costs in an item's standard cost or valuation price, for example, handling
costs or inspection costs. A surcharge serves as a discount if the amount or
percentage entered is a negative value. Surcharge Component The cost component to which the
assembly line's surcharge is linked. Variable Cost Specifies whether the project surcharges are variable or fixed. If this check box is selected, the surcharge is
considered a variable cost. Otherwise, it is considered a fixed cost. Note Fixed costs are only
included in the standard cost of a project if the Include Fixed Costs in Project Valuation parameter is selected. Surcharge Bases Present If this check box is selected, a surcharge base is defined in
the Assembly Line Surcharge Bases (ticpr1190m000) session. Surcharge Amount The surcharge expressed as an amount. You can enter an amount
in this field, if the Surcharge Method field is Fixed Amount. Surcharges are extra
costs in an item's standard cost or valuation price, for example, handling
costs or inspection costs. A surcharge serves as a discount if the amount or
percentage entered is a negative value. | |