The date, or period for which the check is performed.
Generate Assembly Order Lists for Critical Parts (tiasc2245m000)Use this session to generate lists of assembly orders that cannot be executed due to a lack of assembly parts. A report of these orders is displayed in the Assembly Part Shortage - Assembly Orders (tiasc2545m000) session.
Requirement Date The date, or period for which the check is performed. Regenerate Order Lists When you run this session, lists of orders are created for each combination of the dates and assembly parts specified when shortages for his combination exist. If this check box is selected, LN deletes any existing order list for each combination of day and assembly part, in the specified range, new lists replace the existing ones. Note: If no new list can be generated for a specific assembly part and requirement date combination, the old lists are still deleted. If this check box is cleared, LN compares the new lists to the existing ones. Lists are replaced if new orders are found, and new lists are added if new dates and assembly part shortages are found. Orders on existing lists are not deleted, even when they are outdated, the updates are always partial. Use this option only for performance reasons, if you will be running checks one after another. Select Orders Based On Select the set of criteria LN has to consider, if it has to choose out of several orders which to add to the list. The orders with the lowest priority are selected first. There are two sets of criteria: Planned Offline Date and Assembly Order Status. Both sets consist of four criteria. All criteria are listed as fields in the Assembly Part Shortage - Assembly Orders (tiasc2545m000) session. The sets differ in the order of their second and third criterion. The criteria of these sets, in their order of priority are: Planned Offline Date
Assembly Order Status
Note
Number of Extra Orders For each combination of date and assembly part, LN generates a list of orders that together contain the amount of assembly parts that are lacking for that day. If you want a longer list, specify a number of extra orders to be added. These orders are also selected according to the set of criteria you specified.
Generate Click to (re)generate lists of assembly orders that lack critical parts.
| |||