A bill of material (BOM) and routing are available for the item. The demand is filled by a production order.
A list of materials and a work cell are available for the item. The demand is filled by a production schedule.
An assembly bill of material (BOM) and assembly lines are available for the item. The demand is filled by an assembly order.
No production data is available for item. The demand is filled by a purchase order.
The item is supplied by subcontracting the production process. A bill of material (BOM) is specified for this item.
The Subcontracting with Material Flow check box must be selected to select this supply source.
The item is supplied by a planned distribution order.