Standard Cost Surcharge Method

  • Fixed Amount

    The surcharge expressed as a fixed amount can be positive or negative. In the latter case, it is in effect an Item Surcharge Base (ticpr1120m000) discount.

  • % of Total Costs

    The surcharge is a percentage of the total costs as included in the cost calculation.

    Note

    LN does not include surcharges that must be calculated in the surcharge on the total costs, because they are not known at that moment. The surcharge percentage can be positive or negative. In the latter case, it is in effect a discount.

  • % of Added Costs

    This method is similar to the of Total Costs method, except that a surcharge is now only applied to the added costs that are known. Added costs are direct operation costs at the highest level in the product structure, and cost surcharges. In this way, you can avoid that surcharges are applied to surcharges, which is mainly relevant for manufactured parts with a multilevel product structure.

  • % Selective (Total Costs)

    This method is similar to the of Total Costs method. However, the surcharge basis is not the total standard cost, but a selection of the item's total cost structure. Run the Item Surcharge Base (ticpr1120m000) session to specify the cost component(s) to which the surcharge must be applied.

  • % Selective (Added Costs)

    This surcharge method is similar to the of Total Costs method, in which the surcharge basis is not the total standard cost for the selected cost components, but only the added costs for the cost components. Refer to the information on the of Added Costs method.