Workload based on operationsTo prescribe how LN must estimate the workload of planning a plan item, use the Workload Based on Operations check box in the Performance Parameters (cpcom0100m000) session. If this check box is selected, the criterion LN uses for workload distribution across the bshells is the routing composition of each item. The more operations a routing of an item is composed of, the more weight it has. Recommendations:
Performance aspects
| |||