| | Deployment of Sample TemplatesTo deploy the templates, take the following steps: Verify the availability of the following additional file
on the server: In the Additional Files (ttadv2570m000) session in the INT module of the nt
package. Verify that the following additional files are available
on the server: - tptemplates_erp61 and tptemplates_erp61.l:
In the Additional Files (ttadv2570m000) session in the EST module in the tp
package. All three of these files are mandatory. Omission of even one
of these files will render the installation invalid and incomplete. Office Parameters (ntint0500m000) details session
example for UNIX. For Windows, use for example c:\erp\tools\OI as server directory - Place the additional files described in Step 1 and Step 2 in
the Server directory, as described in the Office Parameters (ntint0500m000) session in Step 3.
Run the Import Published ERP Templates (ntint0201m000) session. For more details, refer to the session help or User's and Installation Guide (U8308H US). If the import in Step 5 is successful, the following
templates are found in the company and in the path to where the templates were
imported. From the previous figures, the company is 660 and the path
is /e4/BAAN60/bse/tools/OI: - Bid.dot
- Estimate_line.xlt
- Amounts.xlt
- Quantity_Calculations.xlt
- Bid_Scope.xlt
- Bid_Summary.xlt
- CostPrice_Calculation.xlt
- SalesPrice_Calculation_Markup.xlt
- SalesPrice_Calculation_Target.xlt
- CashFlow_Simulation.xlt
- Report.xlt
| |