Service Planning Parameters (tsspc0100m000)

This session contains:

  • A history list of parameter sets and their effective dates. The most recent parameter sets are at the end of the list.
  • The current parameter set, at the top of the list (without an effective date). To view historical sets, double-click one of the historical parameter sets. You can use the Print Service Parameters (tsmdm0400m000) session to print and compare the parameter sets.

To view or change the current parameters, double-click the set without an effective date that appears at the top of the list. The Service Planning Parameters (tsspc0100m000) details session starts.

If you make changes and save the new parameter setting, LN performs the following actions:

  • Adds the new set at the end of the history list.
  • Updates the current set (at the top of the list).
Note

By default, the Description field contains the date and time when the previous parameter setting was saved. To avoid confusion, if you change the parameters, change or delete the default Description text.

 

Introduction Date

The date and time from which the parameters are valid. The parameters are valid up to the effective date of the most recent parameter setting.

Description

The description of the parameter set. For example, the reason why the previous setting was changed.

Unit for Year

The Unit for Year can be used for the upperscale in the graphical planning tool. This unit is also used for manual input of a prediction's relative moments.

Note

The unit must be of physical quantity time and must have a conversion factor.

Unit for Day

The Unit for Day can be used for the lowest scale in the graphical planning tool. This unit is also used for manual input of a prediction's relative moments.

Note
  • The unit must be a physical quantity of type time and must have a conversion factor.
  • All relative moments of the prediction are converted to this unit, before stored in the database.
Unit

The description or name of the code.

Unit for Tolerance Period

The unit must be a physical quantity of type time.

Number Group for Planned Activities

The default number group for planned activities.

Description

The description or name of the code.

Series for Planned Activities

The default series defined for the planned activities.

Description

The description or name of the code.

Step Size for Activity

The number that defines the sequence for the successive steps that must be performed for activity.

Note

For example, if you enter the value 10, the numbers assigned to successive activities are 10, 20, 30, and so on.

Use Master Routing

If this check box is selected, master routing data can be used to generate activities for service planning and concepts.

Create Planned Inventory Transactions

If this check box is selected, LN allows you to create planned inventory transactions (PIT) for the planned activity material requirements, during the release of the planned activity.

Number Group for Maintenance Scenarios

The default number group for maintenance scenarios.

Series for Maintenance Scenarios

The default series defined for the maintenance scenarios number group.

Group Planning
Number Group for Group Planning Groups

The default number group for planning groups.

Number Group for Attribute Groups
Series for Group Sets

The default series defined for the group sets.

Note
  • This field is applicable only if the Field Service check box and the Depot Repair check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Implemented check box for the service order, work order and planned activity is selected in the Service Planning Parameters (tsspc0100m000) session.
  • This field is applicable only if the Number Group for Group Planning Groups check box is selected.
Series for Reference Points

The default series defined for the reference points.

Series for Resources

The default series defined for the resources.

Distance Calculation Method

The method that must be used to calculate the distance between two locations.

Maximum Number of Route Locations

Group Planning Service Orders
Implemented
Implemented

If this check box is selected, the group planning functionality is implemented for service order activities.

Series for Groups

The default series defined for the service order groups.

Workload Leveling Method

The method to level the workload for group planning.

Note
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Implemented check box for the service order is selected.
Plan Method

The method to plan the service order activities.

Note
  • This field is set to Planning Based on Time if the value for the Workload Leveling Method for the service order is set to Scheduling.
  • This field is set to Planning Based on Route if the value for the Workload Leveling Method for the service order is set to Geographically.

Allowed values

Plan Method

Sort Method

The sorting method for service order activities in an activity set.

Allowed values

Sort Method

Time Period

The time period format used while planning the activities.

Allowed values

Time Period

Workload Leveling
Number of Iterations

The number of iterations to be performed by the territory planning engine for the service orders. A maximum of 10 iterations can be performed. The default value is five.

Note
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Implemented check box for the service order is selected.
  • This field is enabled only if Workload Leveling Method for the service order is set to Geographically.
Minimize Slack

If this check box is selected, the slack periods must be minimized. When workload leveling is implemented, Infor LN minimizes the slack of the activities (for engineers) that are moved from one group to another within a group set.

Note
  • This field is applicable only if the Implemented check box for the service order is selected.
  • This field is applicable only if the value for the Workload Leveling Method field for the service order is set to Scheduling.
  • This field is applicable only if the Respect Earliest Start Time field is set to Scheduling.
Relative Weight of Travel for Service Orders

The factor that determines the required travel duration of the service activities in a group. The value indicates the significance of the travel time to level the workload. A high factor has a higher impact on the required travel duration.

Note
  • The default value is three.
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Implemented check box for the service order is selected.
  • This field is not applicable if the value for the Workload Leveling Method field for the service order field is set to Scheduling.
  • This factor is used by the territory planning engine to estimate travel (number of kilometers).
Respect Earliest Start Time

If this check box is selected, LN considers the earliest start time to plan the service order activity.

Note

For a service order activity, the planned start time must not be planned after the earliest start time.

Material Availability Date

The date LN refers to, for the material availability check in group planning, for the service orders.

Note
  • This field is visible only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Respect Material Availability Date check box is selected on the Group Planning Service Orders tab.
  • By default this field is set to ATP Date, if the Respect Material Availability Date check box for service orders is selected. However, you can modify this value.
Respect Material Availability Date

If this check box is selected, LN considers the Material Availability Date to schedule the service orders, using group planning.

Note
  • This field is visible only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Implemented check box is selected on the Group Planning Service Orders tab.
Material Availability Date

The date LN refers to, for the material availability check in group planning, for the work orders.

Note
  • This field is visible only if the Depot Repair check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Respect Material Availability Date check box is selected on the Group Planning Work Orders tab.
  • By default this field is set to ATP Date, if the Respect Material Availability Date check box for work orders is selected. However, you can modify this value.
Respect Material Availability Date

If this check box is selected, LN considers the Material Availability Date to schedule the work orders, using group planning.

Note
  • This field is visible only if the Depot Repair check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Implemented check box is selected on the Group Planning Work Orders tab.
Respect Latest Finish Time

If this check box is selected, LN considers the latest finish time to plan the service order activity. The Planned Finish Time cannot be planned after the Latest Finish Time.

Note

LN re-plans the route for the activity.

Propagate Firm Planned Down

If this check box is selected,

Propagate Frozen Down

If this check box is selected,

Route Planning
Start Address of Route

The start location of the route.

Average Travel Speed

The average travel speed to calculate travel time when planning a route.

Unit

The unit in which the average travel speed is expressed.

Travel Offset Time

The travel offset time to calculate travel time when planning a route.

Unit

The unit in which the travel offset time is expressed.

Step Size
Group Planning Activity Set Sequence

The step size of the sequence in activity sets for service order activities.

Group Planning Activity Sequence

The step size of the sequence in activities for service order activities.

Resource Allocation
Based on Attribute Values

If this check box is selected, LN allocates resources based on attribute values for service orders.

Based on Skills

If this check box is selected, LN allocates resources based on skills for service orders.

Automatically when only one found

If this check box is selected, LN selects the Allocate Resource to Planning Group check box when only one resource is proposed.

Automatically highest priority

If this check box is selected, LN selects the Allocate Resource to Planning Group check box for the resource with the highest priority.

Check Availability

If this check box is selected, LN checks the availability of the resources for service orders.

Minimum Availability Percentage

The minimum availability percentage of the resource to be allocated for the group planning.

Plan Activities in Resource Calendar

If this check box is selected,:

  • activity status changes to Not Planned after allocation of resources (planning is required before releasing groups)
  • calendar of activities is updated with the calendar of the allocated resource (processing time required)

If this check box is cleared,:

  • activity status remains Planned after resource allocation
  • calendar of activities remains the original customer/installation calendar
  • performance is improved during allocation resources because updating of activities is not allowed
Note

During resource allocation, LN defaults this value in the Used for Planning check box in the Group - Resources (tsspc3102m000) session.

Proposed Priority

The priority sequence for resource allocation.

Group Planning Work Orders
Implemented
Implemented

If this check box is selected, the group planning functionality is implemented for work order activities.

Series for Groups

The default series defined for the work order groups.

Sort Method

The sorting method for work order activities in an activity set.

Allowed values

Sort Method

Time Period

The time period format used while planning the activities.

Allowed values

Time Period

Respect Earliest Start Time

If this check box is selected, LN considers the earliest start time to plan the work order activity.

Note

For a work order activity, the planned start time must not be planned after the earliest start time.

Respect Latest Finish Time

If this check box is selected, LN considers the latest finish time to plan the work order activity. The Planned Finish Time cannot be planned after the Latest Finish Time. The work order activity is not planned.

Propagate Firm Planned Down

Propagate Frozen Down

Workload Leveling
Minimize Slack

If this check box is selected, the slack periods must be minimized. When workload leveling is implemented, Infor LN minimizes the slack of the activities (for engineers) that are moved from one group to another within a group set.

Note
  • This field is applicable only if the Implemented check box for the work order is selected.
  • This field is applicable only if the value for the Workload Leveling Method field for the work order is set to Scheduling.
  • This field is applicable only if the Respect Earliest Start Time field is set to Scheduling.
Step Size
Group Planning Activity Set Sequence

The step size of the sequence in activity sets for work order activities.

Group Planning Activity Sequence

The step size of the sequence in activities for work order activities.

Resource Allocation
Based on Attribute Values

If this check box is selected, LN allocates resources based on attribute values for work orders.

Based on Skills

If this check box is selected, LN allocates resources based on skills for work orders.

Automatically when only one found

If this check box is selected, LN selects the Allocate Resource to Planning Group check box when only one resource is proposed.

Automatically highest priority

If this check box is selected, LN selects the Allocate Resource to Planning Group check box for the resource with the highest priority.

Check Availability

If this check box is selected, LN checks the availability of the resources for work orders.

Minimum Availability Percentage

The minimum availability percentage of the resource to be allocated for the group planning.

Plan Activities in Resource Calendar

If this check box is selected,:

  • activity status changes to Not Planned after allocation of resources (planning is required before releasing groups)
  • calendar of activities is updated with the calendar of the allocated resource (processing time required)

If this check box is cleared,:

  • activity status remains Planned after resource allocation
  • calendar of activities remains the original customer/installation calendar
  • performance is improved during allocation resources because updating of activities is not allowed
Note

During resource allocation, LN defaults this value in the Used for Planning check box in the Group - Resources (tsspc3102m000) session.

Proposed Priority

The priority sequence for resource allocation.

Group Planning Planned Activities
Implemented
Implemented

If this check box is selected, the group planning functionality is implemented for planned activities.

Series for Groups

The default series defined for the planned activities groups.

Workload Leveling Method

The method to level the workload for group planning.

Note
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Implemented check box for the planned activity is selected.
Plan Method

The method to plan the planned activities.

Note
  • This field is set to Planning Based on Time if the value for the Workload Leveling Method for the planned activity is set to Scheduling.
  • The value in this field is set to Planning Based on Route if the value for the Workload Leveling Method for the planned activity is set to Geographically.

Allowed values

Plan Method

Sort Method

The sorting method for planned activities in an activity set.

Allowed values

Sort Method

Time Period

The time period format used while planning the activities.

Allowed values

Time Period

Respect Earliest Start Time

If this check box is selected, LN considers the earliest start time to plan the planned activities.

Note

For a planned activity, the planned start time must not be planned after the earliest start time.

Respect Latest Finish Time

If this check box is selected, LN considers the latest finish time to plan the planned activities. The Planned Finish Time cannot be planned after the Latest Finish Time. The planned activity is not planned.

Note

LN re-plans the route for the activity.

Workload Leveling
Number of Iterations

The number of iterations to be performed by the territory planning engine for the planned activities. A maximum of 10 iterations can be performed. The default value is five.

Note
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Implemented check box for the planned activities is selected.
  • This field is enabled only if Workload Leveling Method for the planned activity is set to Geographically.
Relative Weight of Travel for Service Orders

The factor that determines the required travel duration of the service activities in a group. The value indicates the significance of the travel time to level the workload. A high factor has a higher impact on the required travel duration.

Note
  • The default value is three.
  • This field is applicable only if the Field Service check box and the Depot Repair check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Implemented check box for planned activity is selected.
  • This field is not applicable if the value for the Workload Leveling Method field for the planned activity is set to Scheduling.
  • This factor is used by the territory planning engine to estimate travel (number of kilometers).
Minimize Slack

If this check box is selected, the slack periods must be minimized. When workload leveling is implemented, Infor LN minimized the slack for the activities which are moved from one group to another within a group set.

Note
  • This field is applicable only if the Implemented check box for the planned activity is selected.
  • This field is not applicable if the value for the Workload Leveling Method field for the planned activity field is set to Scheduling.
  • This field is applicable only if the Respect Earliest Start Time check box is selected.
Route Planning
Start Address of Route

The start location of the route.

Average Travel Speed

The average travel speed to calculate travel time when planning a route.

Travel Offset Time

The average travel speed to calculate travel time when planning a route.

Step Size
Group Planning Activity Set Sequence

The step size of the sequence in activity sets for planned activities.

Group Planning Activity Sequence

The step size of the sequence in activities for planned activities.

Resource Allocation
Based on Attribute Values

If this check box is selected, LN allocates resources based on attribute values for planned activities.

Based on Skills

If this check box is selected, LN allocates resources based on skills for planned activities.

Automatically when only one found

If this check box is selected, LN selects the Allocate Resource to Planning Group check box when only one resource is proposed.

Automatically highest priority

If this check box is selected, LN selects the Allocate Resource to Planning Group check box for the resource with the highest priority.

Check Availability

If this check box is selected, LN checks the availability of the resources for planned activities.

Minimum Availability Percentage

The minimum availability percentage of the resource to be allocated for the group planning.

Plan Activities in Resource Calendar

If this check box is selected,:

  • activity status changes to Not Planned after allocation of resources (planning is required before releasing groups)
  • calendar of activities is updated with the calendar of the allocated resource (processing time required)

If this check box is cleared,:

  • activity status remains Planned after resource allocation
  • calendar of activities remains the original customer/installation calendar
  • performance is improved during allocation resources because updating of activities is not allowed
Note

During resource allocation, LN defaults this value in the Used for Planning check box in the Group - Resources (tsspc3102m000) session.

General
Number Group for Territory Planning

The default number group for territory planning.

Series for Territory Planning

The default series defined for the territory planning number group.

Number of Visits per Day

The average number of visits a service engineer can perform in one day.

Unit

The unit in which the number of visits per day is expressed.

Calculation
Use Provider for Distance Calculations

If this check box is selected, LN uses web service to calculate distance/travel time.

Provider

The information provider to calculate travel/distance time.

Allowed values

Provider

Note

This field is enabled only if Use Provider for Distance Calculations check box is selected.

Create Log File

If this check box is selected, LN generates a log file on the server. This log file helps the user (or Infor Support) to detect and analyse the problems.

Generate Planned Activities in the Past Allowed

If this check box is selected, you can set the From Date in the Generate Maintenance Plan (tsspc2200m000) session to a date before the current date.

Status Generated Planned Activity

The default status of the planned activities, that are generated when a maintenance plan is generated using the Generate Maintenance Plan (tsspc2200m000) session.

Priority 1

The first priority to set the default department for the generation of planned activities.

Priority 2

The second priority to set the default department for the generation of planned activities.

Priority 3

The third priority to set the default department for the generation of planned activities.

Priority 4

The fourth priority to set the default department for the generation of planned activities.

Copy Resource Requirements on Status

The planned activity status which determines when the resource requirements are created.

Priority 1

The first priority to set the earliest date for the generation of planned activities for serialized items.

Allowed values

Date Priority

Priority 2

The second priority to set the earliest date for the generation of planned activities for serialized items.

Allowed values

Date Priority

Priority 3

The third priority to set the earliest date for the generation of planned activities for serialized items.

Allowed values

Date Priority

Priority 4

The fourth priority to set the earliest date for the generation of planned activities for serialized items.

Allowed values

Date Priority

Use Life Cycle

If this check box is selected, you cannot generate the planned activities after the end date (life cycle) of the serialized item.

Use Rule Book for Maintenance Scenarios

If this check box is selected, the application determines the maintenance scenario for the serialized item using the rule book, based on the defined search criteria. If this check box is cleared, you can manually add a maintenance scenario for the serialized item.

Use Service Item Group

If this check box is selected, you can use the rules specified for the service item group of the serialized item as a search criterion.

Note

This field is enabled only if the Use Rule Book for Maintenance Scenarios check box is selected.

Use Serialized Item Group

If this check box is selected, you can use the rules specified for the serialized item group of the serialized item as a search criterion.

Note

This field is enabled only if the Use Rule Book for Maintenance Scenarios check box is selected.

Use Item

If this check box is selected, you can use the rules specified for the item as a search criterion.

Note

This field is enabled only if the Use Rule Book for Maintenance Scenarios check box is selected.

Use Project Segment of Item

If this check box is selected, you can use the rules specified for the project segment of the item as a search criterion.

Note

This field is enabled only if the Use Rule Book for Maintenance Scenarios and Use Item check boxes are selected.

Use Serial Number

If this check box is selected, you can use the rules specified for the serial number of the item as a search criterion.

Note

This field is enabled only if the Use Rule Book for Maintenance Scenarios and Use Item check boxes are selected.

Use Installation Group

If this check box is selected, you can use the rules specified for the installation group of the serialized item as a search criterion.

Note

This field is enabled only if the Use Rule Book for Maintenance Scenarios check box and Use Item or Use Service Item Group check boxes are selected.

Use Usage Class

If this check box is selected, you can use the rules specified for the usage class of the serialized item as a search criterion.

Note

This field is enabled only if the Use Rule Book for Maintenance Scenarios and Use Item check boxes are selected.