Project Equipment (tppdm6512m000)

Use this session to list project-specific equipment cost objects, which you can define and modify in the Project Equipment (tppdm6112s000) session. These differ from standard equipment cost objects in that they refer to a particular project. Equipment cost objects represent the equipment you need to perform project tasks.

Note

If you want to list standard equipment cost objects, use the session

  • Equipment (tppdm0512m000)

 

Project

The code that identifies the project for which the current equipment cost objects are defined.

Description

The description or name of the code.

Status

The status of the project.

Equipment

The code that identifies the cost object.

Description

The description or name of the code.

Search Key

The search key associated with the cost object.

Control Code

The control code associated with the cost object. The control code can be a standard cost object or a project-specific cost object.

ref.type

The reference type indicates whether the control code is a standard or a project related labor.

  • S indicates that the control code is a standard cost object.
  • P indicates that the control code is a project-specific cost object.
Cur

The currency for the unit price.

Cost Rate

The cost rate.

Text

If this check box is selected, a text is present.