Generate Alternatives for Estimated Materials (ticst0216m000)

Use this session to check the inventory position of the estimated materials and use alternative materials or use-up materials, where appropriate.

Note

This functionality is available only if the Use Up and Alternative Materials check box is selected in the Implemented Software Components (tccom0100s000) session.

After the production order is released or the estimated costs are frozen, you can no longer generate alternatives for those estimated materials. The estimated costs are frozen if the Estimated Costs Are Frozen check box in the Production Orders (tisfc0501m000) details session is selected.

 

Selection

Select how the production orders are chosen.

Allowed values

  • By Order
  • By Group
Site

The site ID.

Production Order

An order to produce a specified quantity of an item on a specified delivery date.

Project

A collection of manufacturing and purchasing actions that are performed especially for a particular customer order. A project is initiated to plan and coordinate the production of these items.

For a standard-to-order production, the project is only used to link the item with the customer order. Otherwise, a project can include:

  • Customized item data (BOMs and routings)
  • Project planning (activity planning)

A budget is a special type of project. A budget is used to plan and estimate, not to carry out production.

Planned Delivery Date

The date on which the production order's end item is planned to be delivered.

Shop Floor Planner

The person responsible for printing, (re)scheduling and releasing production orders and managing workloads.

Item From

The end result of a production order.

A main item is either be changed to an end item (for delivery to a warehouse), or delivered directly to the customer in bulk.

Grouping Selection

If this check box is selected, you can enter an order group in the next field.

Production Order Group

A collection of planned production orders, which you can use as a selection criterion to transfer planned production orders from Enterprise Planning to the Job Shop Control module of Manufacturing.

JSC can use the same collection of production orders to organize manufacturing tasks.

Sort Material Lines based on

This field determines the order by which LN processes the estimated-material lines of all production orders in order to generates alternatives.

This sort order determines for which estimated-material line LN allocates the standard material, as specified in the BOM, and for which estimated-material line LN must choose an alternative material.

Example

Suppose you have two production orders, PR001 and PR002, as shown in the following figure. Both production orders require component C as material.

  • PR001
    You need a quantity of material C in operation 15 and another quantity of C for operation 20.
  • PR002
    Material C is required in operation 12.
Two production orders that use the same material
				C

Two production orders that use the same material C

If you set this field to Material Allocation Date, this session processes the estimated materials in the order by which the materials are allocated:

  1. The materials for PR001, operation 15
  2. The materials for PR002, operation 12
  3. The materials for PR001, operation 20

If you set this field to Production Order Start Date, this session processes the estimated materials in the following order:

  1. All materials for PR001, because this production order is started first. These materials are ordered by estimated-material position, including the lines linked to operations 15 and 20.
  2. All materials for PR002, also ordered by estimated-material position, including the lines linked to operation12.
Always Reconsider Alternatives

This check box determines how LN reacts if a standard material was unavailable during an earlier planning run and becomes available later, after LN replaced the standard material by an alternative material.

If this check box is selected, LN repeats the entire material-availability check and discards the previous selection of standard materials and alternative materials.

If you select this check box, the planning process can become nervous, because LN changes the material allocations each time a higher-priority alternative becomes available.

If this check box is cleared, LN first checks whether you can execute the production order with the currently selected materials. If that is the case, LN does not change the planned materials, even if a higher-priority material has become available in the mean time.

If you clear this check box, the planning process will be less nervous, because LN changes the material allocations only if that action is absolutely necessary.

 

Generate

Starts the generation process.