| Landed costs – setupTo set up landed costs: - In the Implemented Software Components (tccom0500m000) session, on the Concepts (Logistics) tab, ensure that the Landed Costs check box is selected.
-
In the Landed Costs Parameters (tclct0100m000) session, specify these fields: - In the Landed Cost Types (tclct0110m000) session, specify landed cost types.
- In the Landed Costs (tclct1115m000) session, specify landed costs.
- In the Landed Costs Classifications (tclct0120m000) session, specify landed costs classifications.
- In the Landed Costs Sets (tclct1100m000) session, specify landed costs sets.
- In the Scenarios by Landed Costs Set (tclct1105m000) session, specify landed costs scenarios.
| |