Reprocess Production Orders (tisfc1203m000)

Use this session to reprocess several production orders automatically to include changes that are made in basic data such as BOM and routing. The session completely regenerates the production orders: the existing production order data is deleted, and the BOM and routing data for the new Reference Date are used.

 

Planner

The logon code of the employee who plans plan items.

Regenerate for Net-Change JSC Items Only

If this check box is selected, material requirements are recalculated for items with changes to their BOM or routing. In that case, the Net Change JSC check box in the Item - Production (tiipd0101m000) details session is selected. Only the orders and operations for those items are replanned. If all production orders of the item are reprocessed correctly, the Net Change JSC check box in the Item - Production (tiipd0101m000) details session is cleared.

If this check box is cleared, all production orders for the range of items that you have defined in the current session are reprocessed.

It is quicker to regenerate the production orders for net-change items only than to regenerate all production orders. You can regenerate the production orders for net-change items, for example, to see the effect of a changed sales forecast.

Update Production Order Reference Date

If this check box is selected, LN changes the Reference Date field in the Production Order (tisfc0101s000) session to the value you enter in the Reference Date field in the current session.

The Reference Date can be used to select effective operation lines and BOM lines defined in the sessions:

  • Bill of Material (tibom1110m000)
  • Routing Operations (tirou1102m000)

If you select this check box, the Reference Date field becomes active.

If the item is a customized item, and you entered a configuration date in the Projects (tipcs2101m000) session, that date is used instead of the current field.

Reference Date

This field is only active if you have selected the Update Production Order Reference Date check box.

LN will change the Reference Date field in the Production Order (tisfc0101s000) session to the value you enter in the current field.

The date in the current field determines the selection of operation lines and BOM lines defined in the sessions:

  • Bill of Material (tibom1110m000)
  • Routing Operations (tirou1102m000)

If the item is a customized item, and you entered a Reference Date in the Projects (tipcs2101m000) session, that date is used instead of the current field.