Print Material Shortages by Production Order (tisfc0419m000)

Use this session to check whether the material that is required for production orders is available in time.

Report

The report displays the following symbols:

*Indicates a material shortage.
!Indicates that the material availability depends on the execution of other orders. If those orders are delayed, a material shortage can occur.

 

 

Selection Range
Production Order Group

If this check box is selected, you can specify a range of order groups.

Production Order Group

A collection of planned production orders, which you can use as a selection criterion to transfer planned production orders from Enterprise Planning to the Job Shop Control module of Manufacturing.

JSC can use the same collection of production orders to organize manufacturing tasks.

Production Order

An order to produce a specified quantity of an item on a specified delivery date.

Project (PCS)

A collection of manufacturing and purchasing actions that are performed especially for a particular customer order. A project is initiated to plan and coordinate the production of these items.

For a standard-to-order production, the project is only used to link the item with the customer order. Otherwise, a project can include:

  • Customized item data (BOMs and routings)
  • Project planning (activity planning)
Production Start Date and Time

The start date and time of the production order.

Planner

The employee or department responsible for planning the production, purchase and distribution of items. The planner takes into account the inventory levels, availability of materials, and capacities of resources, and reacts on signals such as rescheduling messages that LN generates.

Shop Floor Planner

The person responsible for printing, (re)scheduling and releasing production orders and managing workloads.

Options
Check

Determines what kind of check this session performs.

Allowed values

Kind of Check

Scope

Determines from which warehouses LN takes the available inventory into account.

Allowed values

  • Current Warehouse Only
    Take only the inventory in the warehouse of the material into account. The material's warehouse is displayed in the Warehouse field in the Bill of Material (tibom1110m000) session.
  • Planned Warehouses in Planning Cluster
    Take the inventory into account in all warehouses in the same cluster as the material's warehouse. In general, nearby warehouses belong to the same cluster. However, LN excludes the warehouses for which the Include in Enterprise Planning check box in the Warehouses (tcmcs0503m000) session is cleared.
  • All Warehouses in Planning Cluster
    Take the inventory into account in all warehouses in the same cluster as the material's warehouse, regardless of the setting of the Include in Enterprise Planning check box in the Warehouses (tcmcs0503m000) session.

If the Check field is Multilevel, this field is Planned Warehouses in Planning Cluster and cannot be changed.

Skip Blocked Inventory

If this check box is selected, LN does not take the inventory that is blocked into account for analyzing the production orders' material supply. Inventory can be blocked for inspection or for other reasons. Select this check box if you expect the material quality to be poor.

If the Check field is Multilevel, this check box is automatically set the same as the Inventory In Inspection Available for Planning check box in the Inventory Handling Parameters (whinh0100m000) session and cannot be changed.

Critical Items Only

If this check box is selected, LN checks only the materials for which the Critical for Inventory check box in the Item - Production (tiipd0101m000) session is selected.

Note

If you check multilevel, and a material that is not critical has lower-level materials that are critical, LN will check these lower-level materials.

Print
Print

Select the type of orders to be printed.

Allowed values

  • All Orders
  • Orders with Shortage
  • Orders without Shortage