Quarantine Inventory (whwmd2672m100)

Use this session to view and maintain disposition lines. The filter options in this session provide optimum flexibility that helps you to easily select the quarantine inventory lines due for processing.

Note
  • The check marks next to the filter options indicate the filters that are activated.
  • The count fields display the number of lines for the filter. This number can be affected by multiple filter settings.

 

Workload
General
Warehouse
Business Partner
Graph Settings
Show Number of Lines
If this check box is selected, the vertical axis of the graph displays the number of lines.

If this check box is cleared, the Unit field is available.

Unit
The unit used to express the total quantity of the goods listed on the lines displayed in the graph.

If some of the transactions are expressed in units other than the selected unit, these units are converted to the selected unit. The units are displayed in the vertical axis of the graph.

Note

This field is available if the Show Number of Lines check box is cleared.

Workload
Awaiting Disposition
If a check mark is displayed, the quarantine inventory lines with disposition status Awaiting Disposition are displayed on the Quarantine Inventory tab and the Workload graph.

Click Awaiting Disposition to activate this filter.

Count
The number of disposition lines for the filter. This number can be affected by other filter settings.
To Be Processed
If a check mark is displayed, the disposition lines for which the disposition is yet to be processed are displayed on the Quarantine Inventory tab and the Workload graph.

Click To be Processed to activate this filter.

Inbound
If a check mark is displayed, the disposition lines related to a receipt line are displayed on the Quarantine Inventory tab and the Workload graph.

Click Inbound to activate this filter.

Outbound
If a check mark is displayed, the disposition lines related to an outbound advice are displayed on the Quarantine Inventory tab and the Workload graph.

Click Outbound to activate this filter.

Disposition Due Date
Past Due
If a check mark is displayed, the disposition lines for which the dispositions are overdue are displayed on the Quarantine Inventory tab.

Click Past Due to activate this filter.

Due Today
If a check mark is displayed, the disposition lines for which the dispositions are due for the current date (today) are displayed on the Quarantine Inventory tab.

Click Due Today to activate this filter.

Due 1-7 Days
If a check mark is displayed, the disposition lines for which the dispositions are due in the next week are displayed on the Quarantine Inventory tab.

Click Due 1 - 7 Days to activate this filter.

Due Beyond 1 Week
The disposition lines for which the dispositions are due in more than a week after the current date are displayed on the Quarantine Inventory tab.

Click Due Beyond 7 Days to activate this filter.

Graph
The graph that displays the workload based on the options specified in the General and Workload group boxes.

If the Show Number of Lines check box is selected, the vertical axis displays the number of inspection lines.

If a unit is specified in the Unit field, the vertical axis displays the total quantity of the goods listed on the inspection lines expressed in the specified unit.

The horizontal axis displays the inspection lines categorized by Past Due, Due Today, Due 1 - 7 Days, and Due Beyond 7 Days.

Results
Graph Settings
Number of Periods
The number of periods to be presented in the graph.

The maximum number of periods allowed is 12, irrespective of the selected type of period in the Period field.

Period
The type of period to be presented in the graph.

Allowed values

Period of time

Item
The item for which you can view the disposition status in the graph.
Note

You must select an item to view data in the graph.

Description
The description or name of the code.
Show
Quarantine
If this check box is selected, the number of items that are quarantined for a specified period are displayed in the graph.
Return to Vendor
If this check box is selected, the number of items with status Return to Vendor are displayed in the graph.
Use As Is
If this check box is selected, the number of items with status Use As Is are displayed in the graph.
Rework (to Existing Specification)
If this check box is selected, the number of items with status Rework (to Existing Specification) are displayed in the graph.
No Fault Found
If this check box is selected, the number of items with status No Fault Found are displayed in the graph.
Scrap
If this check box is selected, the number of items with status Scrap are displayed in the graph.
Rework (to New Specification)
If this check box is selected, the number of items with status Rework (to New Specification) are displayed in the graph.
Reclassify
If this check box is selected, the number of items with status Reclassify are displayed in the graph.
Results
Graph
The graph displays the number of items for a specified period, based on the selected status in the Show group box.