Generate Maintenance Plan (tsspc2200m000)

Use this session to generate maintenance plans for a range of serialized items.

Note
  • You can generate maintenance plans for the serialized items only if:
    • The Generate Planned Activities check box is selected in the Serialized Items (tscfg2100m000) session for the serialized items.
    • A maintenance scenario is assigned to the serialized items.
    • The status of the serialized item is set to Active, Working Condition or Defective.
  • The start date for the serialized items is equal to the effective date of the Serialized Items (tscfg2100m000) session. The effective date is the installation time of the serialized item and if it is not filled then it is the delivery time and if the delivery time is also not filled then it is creation time of the serialized item.
  • The serialized item's start value is equal to the planned dependent value that you defined for the serialized item in the Planned Activities (tsspc2100m000) session.

 

Selection Range
Use the fields in the Selection Range group box to specify the range of data for which the maintenance plans must be generated.
Selection Maintenance Scenarios
The option to select the maintenance scenarios.
Type of Scenario
The type of scenarios for which the maintenance plans are generated.
Maintenance Scenario
The From and To fields define a range of: the maintenance scenario codes.
Selection Serialized Items
The option to select the serialized items.
Owner
The From and To fields define a range of: the sold-to business partners specified for the serialized item.
In Use-by Business Partner
The From and To fields define a range of: the in use-by business partners.
Service Department
The From and To fields define a range of: the service departments.
Installation Group
The From and To fields define a range of: the installation groups.
Service Item Group
The From and To fields define a range of: the service item groups.
Serialized Item Group
The From and To fields define a range of: the serialized item groups.
Usage Class
The From and To fields define a range of: the usage classes
Item
The From and To fields define a range of: the items.
Serial Number
The From and To fields define a range of: the serial numbers.
Use Horizon
If this check box is selected, you can specify the time period during which the maintenance plans are generated.
Period
The number of time periods for which the maintenance plans are generated.
Note

This field is enabled only if the Use Horizon check box is selected.

Period Unit
The unit in which the Period is expressed.
Note

This field is enabled only if the Use Horizon check box is selected.

From Date
The planned activities can be generated from this date.
Note
  • By default, the current system date is used.
  • You can set this value to a date before the current date only if the Generate Planned Activities in the Past Allowed check box is selected in the Service Planning Parameters (tsspc0100m000) session.
To Date
The planned activities can be generated up to this date.
Note
  • This field is enabled only if the Use Horizon check box is cleared. You must set the field to a date greater than the From Date.
  • If the Use Horizon check box is selected, the value in this field is derived as follows: To Date = From Date + Horizon Period
Only Generate Maintenance Plan for Active Contract Period
If this check box is selected, for each serialized item within the specified range, the following is applicable:
  • Based on the From Date, the application searched for an active contract for the serialized item. If not available, planned activities are not generated.
  • In case an active contract exists and if the To Date is after the contract end date, the To Date is defaulted with the contract end data.
Start Maintenance Cycle
The options to initiate the maintenance cycle.
Note
  • This field is enabled and applicable only if:
    • The Type of Scenario is set to Time Based Only or Time Based and Usage Based.
    • The maintenance scenario line is of the type Time Based or Time Based Pattern.
  • By default, this field is set to Start Date of Serialized Item.
Time Based Activities
The setting to generate the maintenance plans for the time based activities.

Allowed values

Generation Type

Usage Based Activities
The setting to generate the maintenance plans for the usage based activities.

Allowed values

Generation Type

Simulate
If this check box is selected, the generation of the maintenance plans is only simulated and no real planned activities are created.
Process Report
If this check box is selected, a process report is generated with the updated values when the process execution is successful.
Note

The application selects and disables this check box if the Simulate check box is selected.

Error Report
If this check box is selected, an error report is generated with the details of the error when the process execution fails.
Information Report
If this check box is selected, the plan information report is printed.