Budget Cost Analysis Version (tpptc3100s000)Use this session to maintain a budget-cost analysis for the actual budget of a selected project. If the actual budget is composed of activities, you must also specify a plan. You can include budget lines in the budget-cost analysis according to their budget line status. After you have created a budget-cost analysis version, you can generate analysis data for the version with the Generate Budget Cost Analysis (tpptc3200m000) session. Finally, you can display and print details from the analysis data using any of the sessions accessible from the Budgeted Project Costs (tpptc3801m000) session.
Project The code that uniquely identifies the project. Project Cost Analysis Version An analysis of the bottom-up budget. You can run several cost
analyses for the same budget. Each budget is stored with a combined project
code and budget cost-analysis code, so you can compare the budgets. Date of Last Update The date on which the latest budget-cost analysis was performed
via the Generate Budget Cost Analysis (tpptc3200m000) session for the selected
budget-cost analysis version. Budget Settings Budget Type The type of budget for the project. Plan The code that uniquely identifies the plan. Update Mode Initial Budget If this check box is selected, and a budget has been
generated for this budget-cost analysis version, this budget is
frozen. Costs Included from Budget with Status Free If this check box is selected, budget lines with the
status Free are included in the
budget-cost analysis. You can change the setting in the Generate Budget Cost Analysis (tpptc3200m000) session. The check box adopts the new setting after the Generate Budget Cost Analysis (tpptc3200m000) session is run. Budget with Status Actual If this check box is selected, budget lines with the
status Actual are included in the
budget-cost analysis. You can change the setting in the Generate Budget Cost Analysis (tpptc3200m000) session. The check box adopts the new setting after the Generate Budget Cost Analysis (tpptc3200m000) session is run. Budget with Status Final If this check box is selected, budget lines with the
status Final are included in the
budget-cost analysis. You can change the setting in the Generate Budget Cost Analysis (tpptc3200m000) session. The check box adopts the new setting after the Generate Budget Cost Analysis (tpptc3200m000) session is run. Exchange Rate Type Budget A way to group currency exchange rates. You can assign
different currency exchange rates to different invoice-to business partners
and/or to different types of transactions (purchase, sales, and so on). Rate Date The date used to determine the correct currency rate for the exchange rate type. Extensions If this check box is selected, extensions are included in the budget-cost
analysis calculation.
| |||