Operation Relationships by Order (tisfc1102m000)

Use this session to alter the structure of the routing, that is, the sequence of operations. You can change the next operation for operations which are not Completed.

 

Production Order
Production Order
The order status of the production order.

Allowed values

Order Status

Start Operation
If the operation does not follow any other operation, this field displays an indicator for a start operation.

Related topics

End Operation
If the operation is the final operation, this field displays an indicator for an end operation.

Related topics

Operation
One of a series of steps in a routing that are carried out successively to produce an item.

The following data is collected during a routing operation:

  • The task. For example, sawing.
  • The machine used to carry out the task (optional). For example, sawing machine.
  • The place where the task is carried out (work center). For example, woodwork.
  • The number of employees required to carry out the task.

This data is used to compute order lead times, to plan production orders and to calculate standard cost.

Next Operation
The operation after the current operation. You can change the order of operations by editing this field.

Related topics

Operation Set
A set of operations consecutively carried out at the same work center.
Task
The task that is performed in the operation.
Work Center
The work center where the operation is performed.
Operation Status
The status of the operation.