Print Production Order Documents (tisfc0408m000)

Use this session to print production order documents such as routing sheets, material sheets and subcontracting notes.

 

Selection Range
Project (PCS)
A collection of manufacturing and purchasing actions that are performed especially for a particular customer order. A project is initiated to plan and coordinate the production of these items.

For a standard-to-order production, the project is only used to link the item with the customer order. Otherwise, a project can include:

  • Customized item data (BOMs and routings)
  • Project planning (activity planning)
Production Order
An order to produce a specified quantity of an item on a specified delivery date.
Operation
One of a series of steps in a routing that are carried out successively to produce an item.

The following data is collected during a routing operation:

  • The task. For example, sawing.
  • The machine used to carry out the task (optional). For example, sawing machine.
  • The place where the task is carried out (work center). For example, woodwork.
  • The number of employees required to carry out the task.

This data is used to compute order lead times, to plan production orders and to calculate standard cost.

Production Date
This field refers to the production start date and time field in the Production Orders (tisfc0501m000) session.
Item Group
A group of items with similar characteristics. Each item belongs to a particular item group. The item group is used in combination with the item type to set up item defaults.
Warehouse
A place for storing goods. For each warehouse, you can enter address data and data relating to its type.
Planner
The logon code of the employee who plans plan items.
Shop Floor Planner
The employee responsible for planning on the job shop.
Routing Group
A group of items with similar routing attributes, for example, the same work center, routing operation, BOM, and so on. A routing group is defined by the user as a selection criterion for production orders.
Product Line
A group of products made by the same producer, that are similar but differ in details such as, size, shape, color, and so on. User-definable item grouping data, mainly used as an item selection criterion for reporting.
Product Class
User-definable item grouping data that is used to distinguish between different groups of items in a product line. The product class is mainly used as a selection criterion for reporting.
Selection Code
User-definable item grouping data. Use selection codes to select items by color, diameter, product expiry date, and so on.
Note

Selection codes are used for information purposes only.

Grouping Selection
Grouping Selection
If this check box is selected, the order documents of all the production orders in the production order group that you select are printed.

Related topics

Production Order Group
Enter the production order group for which you want to print documents.
Options
Print Options
Originals
If this check box is selected, the documents are printed that have not yet been printed for a production order.

This means that the documents are printed for which the corresponding field in the Production Order (tisfc0101s000) session has the value Original Document.

Related topics

Duplicates
If this check box is selected, duplicates are printed of the documents that had been printed before but only if the data on the document has not changed since it was printed the first time.

This means that the documents are printed for which the corresponding field in the Production Order (tisfc0101s000) session has the value Document Printed.

Related topics

Modified
If this check box is selected, documents are printed that had been printed before but for which the data has changed since it was printed.

This means that the documents are printed for which the corresponding field in the Production Order (tisfc0101s000) session has the value Modified Document.

Related topics

Enterprise Unit
If this check box is selected, you can enter an enterprise unit in the Enterprise Unit field for which production order documents must be printed.The session prints the order documents for the work centers that belong to the enterprise unit entered in this field.
Production Date range applies to Operation Start Date
If this check box is selected, the Remainder Start Date of operations determines for which production orders documents are printed. Order documents are only printed for production orders with uncompleted operations whose earliest Remainder Start Date is within the Production Date range (defined on the first tab). Operation notes, material issue notes, and subcontracting notes are only printed for operations which have a Remainder Start Date within the Production Date range.

If this check box is cleared, the Production Start Date of the production order determines whether order documents are printed. Order documents are printed when the Production Start Date of the production order is within the Production Date range.

Print Specification
Orders Sorted By
Orders Sorted By
The way the order are sorted for which you want to print the production order documents.

Allowed values

  • Order Number
  • Project (PCS) and Order
Documents Sorted By
The order that production order documents are printed.

Allowed values

  • Documents by Order
  • Orders by Document
Infor SCM Scheduler
Print Order Documents Planned Orders
If this check box is selected, order documents for planned orders are printed.
Change Order Status for orders without operations
If this check box is selected, order status for orders without operations is changed.
Documents
Documents to be Printed
Order Covering Note
If this check box is selected, the covering note is printed.
Routing Sheet
If this check box is selected, the routing sheet is printed.

Related topics

Operation Note
If this check box is selected, the operation note is printed.
Collective Sawing List
If this check box is selected, the collective sawing list will be printed.
Cutting List
If this check box is selected, the cutting list is printed.
Collective Cutting List
If this check box is selected, the collective cutting list will be printed.

Related topics

Material List
Receipt Note
If this check box is selected, the receipt note is printed.
Material Issue Note
If this check box is selected, the material issue note is printed.
Inspection Note
If this check box is selected, the inspection note is printed.
Note

This is the default setting.

Subcontracting Note
If this check box is selected, the subcontracting note is printed.

Related topics

Collective Material Issue Note
If this check box is selected, the reports for the entire order group are combined.

If this check box is cleared, each production order produces a report on a separate page.

Related topics

Checklist
If this check box is selected, the checklist is printed.
Serial Number List
If this check box is selected, the serial numbers generated for the items specified in the production order are printed.
Sawing List
If this check box is selected, the sawing list is printed.
Include Microrouting on Routing Sheet
If this check box is selected, the information you linked to the microrouting is printed on the routing sheet.

Related topics

Order Distribution
If this check box is selected, the order distribution report is printed.

 

Print
Prints the entered selection.