Subcontracting WIP (ticst0607m000)

Use this session to view the subcontracting WIP costs.

The tabs refer to the following sessions:

 

Production Order
The production order the subcontracting WIP belongs to.
Position
The position number that identifies the estimated material in the Estimated Materials (ticst0101m000) session.
Note

The position number is the same as that in the Material to Issue for Production Orders (ticst0101m100) session.

Sending WIP
If this check box is cleared, the displayed amounts are related to the subassembly that is sent to the subcontractor.

If this check box is selected, the displayed amounts are related to the subassembly that is received from the subcontractor.

Total Amount
The total cost of subcontracted WIP for the production order.
Total Quantity
The total quantity of subcontracted WIP materials for the production order.
Subassembly
The description of the subassembly that is subcontracted.
Quantity Balanced
If this check box is selected, the quantity of outgoing subassembly is equal on the quantity of incoming subassemblies.