The production order the subcontracting WIP belongs
to.
Subcontracting WIP (ticst0607m000)Use this session to view the subcontracting WIP costs. The tabs refer to the following sessions:
Production Order The production order the subcontracting WIP belongs
to. Position The position number that identifies the estimated material in
the Estimated Materials (ticst0101m000) session. Note The position number is the same as that in the Material to Issue for Production Orders (ticst0101m100) session. Sending WIP If this check box is cleared, the displayed amounts are
related to the subassembly that is sent to the subcontractor. If this check box is selected, the displayed amounts are related to the subassembly that is received from the subcontractor. Total Amount The total cost of subcontracted WIP for the production
order. Total Quantity The total quantity of subcontracted WIP materials for the
production order. Subassembly The description of the subassembly that is
subcontracted. Quantity Balanced If this check box is selected, the quantity of outgoing
subassembly is equal on the quantity of incoming subassemblies.
| |||