Check Project Peg Indicators (tibom1222m000)

Use this session to check if project pegs from a manufactured item or generic item are inherited by the relevant components in an exploded BOM.

 

From Item
Select the range of manufactured items or generic item to be checked.
Note

If this session is started from the Generic BOMs (tipcf3110m000) session, only items with a generic BOM are part of the selection range.

If this session is started from the Bill of Material (tibom1110m000) session, only items with a production BOM are part of the selection range.

Check Effectivity against Date
If this check box is selected, BOM lines with an effectivity date before the selected date and an expiry date after the selected date are checked.
Print Error Messages Only
If this check box is selected, only items with a BOM that contains a loop or where the inheritance of the project peg is not possible are printed.

 

Check
Print the Check Project Peg Indicators report.