Use Up and Alternative Materials (tibom0150m000)Use this session to maintain the use-up materials and alternative materials for the materials in a bill of material (BOM). To change the priority of an alternative material, select the alternative-material line and click Move Priority Up or Move Priority Down
Main Item The main item of which you want to maintain the use-up item
or the alternative items. BOM Position The component's BOM position number. Sequence Number The BOM sequence number is a subdivision of the component item's BOM position number. Material The component item that is part of the manufactured item (the
standard material). Alternative Identification of the alternative-material record. Alternative Priority The alternative priority determines which of the alternatives LN will select first. Allowed values
Alternative Material The alternative material. Note The alternative item must be a non-configurable item. For more information on procuring purchased configurable items, refer to Allowed values If the item is a project item, the project must be equal to the project of the main item. First Allowed Order Date The value of the First Allowed Order Date field in the Items - Ordering (tcibd2100m000) session or the field of the same name in the Item Data by Warehouse (whwmd2510m000) session, whichever is effective. The setting of the Use Item Ordering Data field in the Item Data by Warehouse (whwmd2510m000) session determines whether you define this parameter for all warehouses or for a specific warehouse. If the Use Item Ordering Data check box is selected, you use the general value of the First Allowed Order Date field. Otherwise, you can specify a warehouse-specific value in the First Allowed Order Date field. LN checks the first allowed order date for the warehouse that is linked to the BOM line. Last Allowed Order Date The value of the Last allowed Order Date field in the Items - Ordering (tcibd2100m000) session or the field of the same name in the Item Data by Warehouse (whwmd2510m000) session, whichever is effective. This information is visible only for use-up materials, not for lower-priority alternative materials. The setting of the Use Item Ordering Data field in the Item Data by Warehouse (whwmd2510m000) session determines whether you define this parameter for all warehouses or for a specific warehouse. If the Use Item Ordering Data check box is selected, you use the general value of the Last Allowed Order Date field. Otherwise, you can specify a warehouse-specific value in the Last Allowed Order Date field. LN checks the last allowed order date for the warehouse that is linked to the BOM line.
Move Priority Up Moves the selected alternative-material line to the next higher
priority. Move Priority Down Moves the selected alternative-material line to the next lower
priority. Copy Item to Alternative Materials Starts the Copy Item to Alternative Materials (tibom0250m000) session. Check Use Up Material Definitions Starts the Check Use Up Material Definitions (tibom0251m000) session. Remove Used Up Materials from Alternative Materials Starts the Remove Used Up Materials from Alternative Materials (tibom0252m000) session.
| |||