The main item for which the BOM is maintained.
BOM Line - Material-Routing Relationships (tibom0140m000)Use this session to to link selected materials to specific operations. Note If no definition is present for a bill of material, material is issued on the first operation of a production order. This is usually operation 10.
Main Item The main item for which the BOM is maintained. Position The component BOM position number. Slash Character The BOM sequence number is a subdivision of the component item's BOM position number. If you create orders for a manufactured item, only the
material with the lowest valid sequence number is taken into account. A
material sequence number can be (in)valid due to effectivity dates or unit
effectivity settings. Item The component item of the manufactured item.
Routing A routing that is used to
produce the main item. You can define one or more routings for an item in the Item - Routings (tirou1101m000) session. Operation The routing operation at which
the BOM line's item must be issued to the job shop. More than one routing can be available to produce an item. The operation at which a material is issued can differ for the various routings.
| |||