| Clustered Line Station Order - Assembly Part Requirements (tiasc7140m000) Clustered Line Station Order Represents all the material requirements for a line station for
a day. A CLSO consists of user-defined buckets. The material requirements are
combined for each bucket. In Assembly Control, transactions can be carried out per line station and per
period, instead of per order. LN can combine the same materials for a specific period into one
material line. After doing so, the cumulated quantity is stored in the CLSO.
This accumulation reduces the number of transactions that are necessary,
because the transactions are performed for a specific bucket. Line Station A work center that is part of an assembly line. A line station
is used in the production of FAS (final assembly schedule) items. A line
station can have multiple positions, which enables more than one item to be
present in one line station. Warehouse Order In case of a Line Station Based scenario, the Warehouse Order number is equal to the Clustered Line Station Order number in this
session. In case of an Order Based scenario, these order numbers are different; the Clustered Line Station Order number is an Assembly Order number and the Warehouse Order number is a different
number. Shop Floor Warehouse The shop floor warehouse where the assembly part is
stored. Assembly Part The component that is allocated to the shop-floor warehouse of
the line station for this time bucket. Option Set The option set of the product variant in PCF, from which the
assembly part originates. The option set and the product variant number indicate the
list of features and options applicable for the assembly part. Warehouse Order Position The warehouse order line that allocates the component to the
shop-floor warehouse of the line station for this time bucket. Quantity Required The quantity of the displayed assembly part that is required by
this order for this time bucket. Cumulative Quantity Allocated The total quantity of the item allocated in the time bucket
concerned, by the allocation of assembly parts. This field is
updated when the assembly part allocations are rebuilt and when the parts are
backflushed. Bucket Start Date A quantity of time used for planning and backflushing. Bucket End Date A quantity of time used for planning and backflushing. To beAllocated If this check box is selected, the assembly parts are not yet allocated to
the time bucket. Quantity to beAllocated The quantity of the assembly parts, which are pending to be
allocated to the time bucket. To beBackflushed If this check box is selected, there are assembly parts which must be
backflushed. Quantity to beBackflushed The quantity of the assembly parts, which are pending to be
backflushed. Quantity Backflushed The quantity of the assembly parts that has already been
backflushed. Requirement Origin The origin of the assembly part requirement. There are two types of requirement origin: - Allocation:
assembly parts are allocated directly through an order or line station based
transaction.
- Manual: assembly parts are allocated manually to clustered line station order.
Text If this check box is selected, a text is present. | |