The project model from which the
data is copied to the reference model.
Import Project Model into Reference Model (tgbrg3205m000)Use this session to import data from a project model into the reference model that you have selected in the Reference Models (tgbrg3500m000) session.
From Project Model The project model from which the
data is copied to the reference model. Companies If this check box is selected, you can select a range
of companies. Parameter If this check box is selected, you can select a range
of parameters. Static Conditions If this check box is selected, you can select a range
of static conditions. Roles If this check box is selected, you can select a range
of roles. Business Function If this check box is selected, you can select a range
of business functions. Business Process If this check box is selected, you can select a range
of business processes. Business Control Diagram If this check box is selected, you can select a range
of business-control diagrams. You can make a subselection on business-control diagrams by entering a range of business-control-diagram categories. Overwrite If this check box is selected, a model item that occurs in
both the reference model and the project model from which it is copied, is
replaced by the model item of the latter model. Delete all existing roles If the roles are linked to model items that are
included in the range you want to import, they are removed.
Import into Project Model If you click this button (or command), the import is started
based on the given criteria.
| |||