Approve Release Lines (tdpur3222m100)Use this session to approve, for nonreferenced schedule, the release lines of a purchase release. You can only approve purchase release lines with the Created status in the Purchase Release (tdpur3121m000) session. When a purchase release line is approved, the release line in the Purchase Release (tdpur3121m000) session and the linked release line detail(s) in the Purchase Release Line - Details (tdpur3522m000) session, which include(s) clustered schedule lines, both receive the Scheduled status. Note
Referenced schedules For referenced schedules, release lines cannot be approved in this session. When a referenced schedule line is created, LN generates a release line with the Scheduled status. The schedule lines are not clustered. Consequently, for every schedule line, a record exists in the Purchase Release Line - Details (tdpur3522m000) session with the Scheduled status. If the referenced schedule is a sequence shipping schedule, no purchase release lines are created in the Purchase Release (tdpur3121m000) session, and no purchase release line details are created in the Purchase Release Line - Details (tdpur3522m000) session. For these schedules, a link exists between the release header in the Purchase Releases (tdpur3120m000) session and the release lines in the Purchase Release Lines - Sequence Shipping Data (tdpur3523m000) session. See: Sequence shipping schedules.
Material Release If this check box is selected, purchase release with the release type material release are included in the approval process. Shipping Schedule If this check box is selected, purchase releases with the release type shipping schedule are included in the approval process. Process Report If this check box is selected, a process report is
generated. Error Report If this check box is selected, if errors occur while
approving the release lines, an error report is generated. Rebuild Release If this check box is selected, the purchase release is rebuilt. The purchase release keeps
the same release revision number and gets/keeps the status Scheduled. You can rebuild the release if:
After you update the schedule line(s), you can either update the release, or rebuild the release. To update the release, on the appropriate menu in the Purchase Release Line - Details (tdpur3522m000) session, click Update Release. To rebuild the release, select the current check box. The release line is generated again for the specific purchase release and directly converted into a release with the status Scheduled.
| |||