Items - Ordering Defaults (tcibd2101m000)

Use this session to view, specify, and maintain the default item ordering data for a combination of item type and item group.

The item ordering data includes:

  • Limits for the quantities that can be ordered.
  • Default values that LN uses to generate the orders.
Note

Before you can define the default ordering data in this session, you must first enter the default general item data for the item type and item group combination in the Items - Defaults (tcibd0102m000) session.

 

Item Type
The item type to which the default values apply.
Item Group
The item group to which the default values apply.
Customize
If this check box is selected, this is an item for which a product structure and/or a project structure is generated per customer order (sales order or contract deliverable). The setting of the With PCS check box determines whether a project structure is generated, and consequently, a PCS project is linked to the customized items.

This table shows when the Customize check box can be selected:

Item TypeDefault Supply SourceCustomizeWith PCS
PurchasedPurchase/ SubcontractYes / NoSame value as the Customize check box
ManufacturedJob ShopYes / NoSame value as the Customize check box
ManufacturedAssembly/ RepetitiveNoNo
GenericPurchase/ Subcontract/ Job ShopYesYes / No
GenericAssemblyNoNo
Cost / ServiceNot ApplicableNoNo
ToolPurchaseNoNo

 

Note

You can specify the Default Supply Source in the Items (tcibd0501m000) session.

Related topics

Order System
The default order system for the item.
Note

The Planned order system only applies if the default supply source is Repetitive.

Related topics

With PCS
If this check box is selected, for a main item, the item structure is generated by using a PCS project.

This table shows when the With PCS check box can be selected:

Item TypeDefault Supply SourceCustomizeWith PCS
PurchasedPurchase/ SubcontractYes / NoSame value as the Customize check box
ManufacturedJob ShopYes / NoSame value as the Customize check box
ManufacturedAssembly/ RepetitiveNoNo
GenericPurchase/ Subcontract/ Job ShopYesYes / No
GenericAssemblyNoNo
Cost / ServiceNot ApplicableNoNo
ToolPurchaseNoNo

 

Note
  • The field is visible only if the Project Control (PCS) check box is selected in the Implemented Software Components (tccom0100s000) session.
  • Because generic items cannot be part of a project, after generation of a project structure for the generic item, a new item is created that is part of a project.

Related topics

Order Method
The item's default order method.

Related topics

Order Interval
The number of workdays or working hours for which all the requirements of a specific item are bundled in one (planned) order, during an order planning run. LN calculates the order interval from the day when the first requirement occurs. Order intervals are used to prevent an excessive number of planned orders in one time period.
[...]
Order Interval Unit
Select Hours or Days as the time unit in which you want to express the order interval.
External Kanban Controlled
If this check box is selected, the Kanban labels are controlled externally.
Planned by Infor Planning
If this check box is selected, planning is done by Infor SCM Planner.
Safety Stock
The safety stock for the item.

The quantities are expressed in the item's inventory unit.

Note

The safety stock must be less than or equal to the maximum inventory or the re-order point.

Seasonal Pattern for Safety Stock
Safety Time
The time that you can add to the normal lead time to protect delivery of goods against fluctuations in the lead time so that an order can be completed before the order's real need date.
Time Unit
Select Hours or Days as the time unit in which you want to express the safety time.
Warehouse
The default warehouse in which the item is stored.

For example, LN uses the default item warehouse:

  • To calculate the item's standard cost
  • To create plan items
  • To generate purchase orders

You must specify a default item warehouse for items of the following types:

  • Purchased
  • Manufactured
  • Generic.
Reorder Point
A set inventory level where, if the total stock on-hand plus total on-order falls below that point, action is taken to replenish the stock.
Planner
The default planner.
Economic Order Quantity
The economic order quantity for the item.

The order quantities are expressed in the item's inventory unit.

Example

LN generates a planned order for 20 units of an item with a SIC order system and the Economic Order Quantity order method.

  • The economic order quantity is 30 units
  • The minimum order quantity is 25

As a result, the order is adjusted to 30 units.

Order Quantity Increment
The size of the step by which the order quantity can be increased.

The recommended order quantity must be a multiple of the quantity that you specify as the order quantity increment. LN verifies this when planned orders are generated.

Example

If the required order quantity is 62 and the order quantity increment is 8, then LN recommends an order quantity of 64.

LN verifies this, when planned orders are generated.

The order quantities are expressed in the item's inventory unit.

Minimum Order Quantity
The minimum order quantity for the item.

The order quantities are expressed in the item's inventory unit.

Note

If you select the Lot Size Calculation Allowed check box, LN updates this field when you run the Global Update of Inventory Parameters (whina2200m000) session.

Example

  • The economic inventory is 100
  • Te reorder point is 230
  • The order method is lot for lot
  • The minimum order is quantity 800

As a result, LN generates a planned order for 800 instead of an order for 130 (230-100).

Maximum Order Quantity
The maximum order quantity for the item.

The order quantities are expressed in the item's inventory unit.

Note

If you select the Lot Size Calculation Allowed check box, LN updates this field when you run the Global Update of Inventory Parameters (whina2200m000) session.

Example

  • The economic stock is 100
  • The reorder point is 530
  • The order method is lot for lot
  • The maximum order quantity is 400

As a result, LN generates two orders for 400 each instead of a single planned order for 430 (530-100).

Fixed Order Quantity
The fixed order quantity for the item.

The order quantities are expressed in the item's inventory unit.

Note

If you select the Lot Size Calculation Allowed check box, LN updates this field when you run the Global Update of Inventory Parameters (whina2200m000) session.

Example

The order method is Fixed Order Quantity and the Fixed Order Quantity is 20. If you require 70 units, LN generates four orders for 20 units each (a total of 80 units).

Lot Size Calculation Allowed
If this check box is selected, LN automatically updates the item's inventory and order data.

The inventory data and order data in this session is automatically updated when you run the following sessions:

  • Global Update of Inventory Parameters (whina2200m000).
  • Calculate Economic Order Quantity (Camp) (whina2201m000)
  • Calculate Demand Forecast (whina2202m000)

When you run the Global Update of Inventory Parameters (whina2200m000) session, the following fields are automatically updated:

  • Safety Stock
  • Maximum Inventory
  • Order Quantity Increment
  • Minimum Order Quantity
  • Maximum Order Quantity
  • Economic Order Quantity
  • Fixed Order Quantity
  • Order Interval
  • Safety Time
  • Reorder Point

When you run the Calculate Economic Order Quantity (Camp) (whina2201m000) session, the Economic Order Quantity field is automatically updated.

When you run the Calculate Demand Forecast (whina2202m000) session, the following fields are automatically updated:

  • Safety Stock
  • Reorder Point
Maximum Inventory
If the order method is Replenish to Maximum Inventory, LN generates purchase orders or production orders for the quantities of the item that are required to reach this inventory level.

The quantities are expressed in the item's inventory unit.

Seasonal Pattern for Forecast
The seasonal demand pattern for the item.
Number of Periods
The number of days, weeks, or months (the selected period type) in one period of the selected seasonal pattern.
Period Type
The unit of time for the period in the selected seasonal pattern.
Service Level
The default service level percentage determines to what extent the item can be delivered directly from inventory.

Example

A service level of 95% means that in 95% of all cases customer demand must be satisfied by an immediate delivery. In other words, No is accepted in 5% of the cases.

Note

A service level of 100% is not recommended, because it causes an infinitely high safety inventory.

Update by Project Cost Calculation
If this check box is selected, LN replaces the Order Quantity Project with the Recommended Order Quantity Project when you run one of the following sessions:
  • Calculate Estimated Cost by Project (ticpr2211m000)
  • Calculate Standard Costs by Project (tipcs3250m000)
Critical in Master Planning
If this check box is selected, this plan item is critical in master planning. This means that in the master-planning process in Enterprise Planning, this item is treated as a critical component.

If the item order system is Planned, you can select or clear this check box.

In order planning, all components are taken into account. In master planning, only critical components are considered.

Note

Master planning uses an item's bill of critical materials (BCM) for production planning. As a rule, the BCM is derived from the BOM, and contains only those components that are designated as critical in master planning. You can generate a BCM for an item in the Generate Bill of Critical Materials (cprpd3220m000) session.

Order Costs
The (administrative) costs for placing an order. Order costs include the handling and transportation costs. The costs of the purchasing department, production planning department, and control department incurred by a production order or a purchase order.

The order costs are expressed in the default currency selected for the item group in the Item Groups (tcmcs0123m000) session.

Currency
The default currency selected for the item group in the Item Groups (tcmcs0123m000) session.
Shop Floor Planner
The default shop floor planner.
Routing Group
The default routing group.