EP Parameters (cprpd0100m000)Use this session to initialize and maintain the EP parameters, which can be used to tailor the workings of Enterprise Planning to company-specific requirements. If you run this session, LN executes the following steps:
Note Although Enterprise Planning operates correctly if you use the default values of the parameters, you can change the parameter values to any desired value.
Effective Date The date and time that the parameters are valid up to the
effective date of a more recent parameter setting. Description The description of the parameter set. For example, you can
indicate why you change the parameters. General Parameters Actual Scenario The scenario that contains the operational master plan or order
plan, as opposed to scenarios used only for simulation, that is, what-if
analysis. The actual scenario is the only scenario from which you can transfer planned orders to the execution level. Note A Capable-to-Promise (CTP) check during sales-order entry in Sales is always based on the actual scenario. Likewise, when a sales order is recorded, only the ATP of the actual scenario can be updated online. Number Group for Order Grouping The number group that is
used for planned-order groups in Enterprise Planning. Series for Order Grouping The series that is used for planned-order groups in Enterprise Planning. Refresh Rate The rate in seconds that determines how often LN performs an automatic
refresh in a session. An automatic refresh retrieves and displays the current data from the database. Note A refresh rate of 0 (zero) means that no refresh is performed. Displayed Period Date This field determines if the period start date or the period
finish date is displayed in various sessions for plan periods that are defined
in days. This applies to the following sessions:
Availabilities Company Availability Type The availability type that LN uses for
production planning. Purchase Availability Type The availability type that LN uses for purchase
planning. You can specify this availability type in the Procurement Parameters (tdpur0100m000) session. Warehouse Availability Type You can specify this availability type in the Availability Type field in the Warehouse Master Data Parameters (whwmd0100s000) session. Availability Type for Transport The availability type that LN uses when
planning transportation lead times. You can specify this availability type in the Availability Type for Carrying Goods field in the COM Parameters (tccom0000s000) session. Exception Messages Currency for Minimum Standard Cost The currency that LN uses to express the minimum standard cost value in the Exception Message Types by Planner (cprao1110m000) session. Planning Parameters General Parameters Round Values If this check box is cleared, no rounding is used in
planning. Note
Online Phase Number Update If this check box is selected, LN updates the phase numbers of items and plan units immediately when a
change occurs in a bill of material (BOM) or bill of critical material (BCM). If you select this check box, the phase numbers of items and plan units are always consistent with the data in the BOMs and BCMs. Performance aspects The setting of this field could affect system performance and database growth. For more information, refer to Online phase-number update. Multisite Planning If this check box is selected, the
central-multisite-planning functionality of Enterprise Planning is in
use. If this check box is cleared, you cannot use the following sessions: Pegging Horizon The number of days into the future for which the
order-based planning generates pegging relations. LN calculates the date of the pegging horizon by using the company calendar. LN records no pegging relations for transactions with a transaction date beyond this horizon. In general, a shorter pegging horizon can give a better system performance, but offers you less pegging information. Important! Set the signal horizon for pegging signals to a lower value than the pegging horizon. Otherwise, LN can generate false Pegging: No Planned Inventory signals and Pegging: No Planned Material Inventory signals in some situations. You can define the signal horizons in the Exception Message Types by Planner (cprao1110m000) session. Performance aspects The setting of this field could affect system performance and database growth. For more information, refer to Pegging horizon. Master Planning Master Planning If this check box is selected, the master-based planning functionality of Enterprise Planning is in use. If this check box is cleared, you cannot use several sessions that are related to:
Moreover, the Convert Master Plan to Planned Orders (cprmp2240m000) session is disabled. Note If this check box is cleared, you can still maintain item master plans and use CTP checks. However, you cannot use master-based supply planning. Workload Control Implemented If this check box is selected, the workload-control functionality of Enterprise Planning is in use. If this check box is cleared, you cannot use the sessions in the Work Load Control module. Online Update Resource Master Plan If this check box is selected, LN updates the resource master plan for a plan item immediately when the capacity utilization
changes, for example, when a capacity CTP reservation is recorded for the resource or when a new planned order is
inserted, and so on. If this check box is cleared, you must update the resource master plan manually, by using the Rebuild Resource Planning (cprmp3200m000) session. Order Planning Order Planning Implemented If this check box is selected, the order-based planning functionality of Enterprise Planning is in use. If this check box is cleared, you cannot use the following sessions:
Only Reschedule Total Order Quantity The Only Reschedule Total Order Quantity check box determines how Enterprise Planning generates rescheduling messages during an order-planning run. If this check box is selected, Enterprise Planning only generates rescheduling messages for the total order quantity of a planned order. If the total order quantity exceeds the requirement, no signal will be generated to cancel part of the order. If this check box is cleared, Enterprise Planning can also generate rescheduling messages for a part of a planned order's order quantity. If the total order quantity exceeds the requirement, a cancel message can be generated for the surplus quantity. Planned Order before Firm/Actual This check box determines whether LN can plan a planned production order, planned purchase order, or planned distribution order before a certain event. This check box determines whether LN can do one of the following:
If this check box is selected, LN can generate planned orders before firm-planned orders, or actual orders with the same source, in case of production or purchase. If this check box is cleared, LN sets the finish date of a planned order on or after the finish date of the last firm-planned order, or actual order with the same source, in case of production or purchase. Note For purchase schedule items, LN only takes into account the Planned Order before Firm/Actual check box for the source types Manufacturing and Distribution. For the planning of purchase schedule items, LN acts as if this check box were selected. Generate Freight Order during MRP Run If this check box is selected, Freight generates
freight orders during an order-planning run. If this check box is cleared, Freight generates freight orders when you carry out the Generate Freight Orders (fmfoc1234m000) session. Create Back Orders for Warehouse Orders with origin EP If this check box is selected, LN creates an extra outbound-order line for a back order in the Outbound Order Lines (whinh2120m000) session of Warehousing if the
inventory of the supplying warehouse is not sufficient to carry out the warehousing order with order origin Enterprise Planning. As soon as the quantity of this
back order is present in the supplying warehouse, the quantity can be shipped
to the receiving warehouse. The advantage of creating back orders in case of insufficient inventory is that a planned distribution order is entirely dealt with in Warehousing after you transferred it to the execution level. Enterprise Planning does not have to generate a new planned distribution order when you generate the order planning. If this check box is cleared, LN does not create extra outbound-order lines in case of insufficient inventory in the supplying warehouse, but ships the quantity that is available. If you subsequently generate the order planning, Enterprise Planning comes across the quantity that was not available, and that could not be shipped to the receiving warehouse, and, as a result, creates a new planned distribution order. Use Available to Transfer If this check box is selected, material designated available to transfer can
be used. Allow Buyer Assignment on Planned Purchase Order If this check box is selected, the Buyer field in the Planned Orders (cprrp1100m000) session becomes editable. Note If this check box is cleared, the Buyer field will remain view only. Forecast Distribution The forecast distribution. Allowed values Transfer Order Planning Exclude Planner on Planned Purchase Order If this check box is selected, the Planner field in the new purchase order will be blank after transfer from a
planned purchase order. Online ATP Update in EP If this check box is selected, LN updates the ATP for a plan item online, when a planned or actual inventory transaction is
recorded for the plan item. LN updates the ATP over the entire planning horizon, but only in the actual scenario. Performance aspects The setting of this field could affect system performance and database growth. For more information, refer to Online ATP update. CTP Check for Sales If this check box is selected, LN carries out a capable-to-promise (CTP) check when a sales order for an
item is closed. If this check box is cleared, LN does not carry out any CTP check, regardless of the values of CTP-related parameters in the Items - Planning (cprpd1100m000) session. Note If you want to use online ATP/CTP checks, but only for particular items, you must set the CTP horizon in the Items - Planning (cprpd1100m000) details session of all other items to zero . Performance aspects The setting of this field could affect system performance and database growth. For more information, refer to CTP check for sales. Delivery Schedule based on Warehouse Calendar If this check box is selected, and you check the ATP in
the ATP Handling (cprrp4800m000) session, LN adjusts the delivery schedule as follows. If a planned delivery date falls on a non-workable moment of the warehouse specified
on the sales order line, LN shifts that delivery date forward to the next workable date and time. Important! If the Delivery Schedule based on Warehouse Calendar check box in the Planning Parameters (cprpd0100m000) session is selected, channel ATP checks can give incorrect results. A quantity of channel ATP is only valid for a specific period. LN cannot transfer unconsumed channel ATP to the next period. If you select the Delivery Schedule based on Warehouse Calendar check box, LN may shift the planned delivery date to a future period that has insufficient channel ATP. Component CTP bucket The level of detail on the time scale for the component CTP check. A shorter value for this field increases order-promising accuracy, but slows down system performance. To make all components CTP buckets equal to the plan periods, set the unit field to Plan Period Definition. Example If you set the Component CTP bucket field to 1 day and Enterprise Planning finds you have insufficient ATP to promise an ordered quantity on the requested order date, Enterprise Planning checks component availability to determine whether the order can be promised for the next day, and so on. If you set the Component CTP bucket field to 1 hour and Enterprise Planning finds you have insufficient ATP to promise an ordered quantity on the requested order date, Enterprise Planning checks component availability to determine whether the order can be promised one hour later, and so on. Performance aspects The setting of this field could affect system performance and database growth. For more information, refer to Component CTP bucket. Include Fixed Delivery Date of Top Item If this check box is selected, LN runs a check on the
fixed delivery type date linked to the plan item. Apply Lot Sizing Rules to Delivery Schedule If this check box is selected, lot sizing rules defined
in the Items - Ordering (tcibd2100m000) are applied to the delivery schedule
calculation. VMI Parameters Number of Revisions The maximum number of revisions of the forecast and the maximum number of revisions of the confirmed supply that LN stores. LN always
stores the most recent revisions and discards older revisions. Note To monitor how well your customer forecasts the demand or to monitor whether your supplier delivers the confirmed supply as promised, set the Number of Revisions field sufficiently high. That enables you to discuss any deviations with your business partner afterwards. If the maximum number of revisions has been reached, and you, as customer, generate orders again, LN deletes the corresponding forecast revision that has the oldest value of the Date Sent field from the Forecast Revisions to Supplier (cpvmi0503m000) session. If the maximum number of revisions has been reached, and you, as supplier, receive another revision of the forecast from your customer, LN deletes the oldest corresponding revision from the Forecast Revisions from Customer (cpvmi0506m000) session. Automatic Accept Forecast If this check box is selected, LN automatically
accepts any forecast message that you receive from your customer. As long as a forecast revision has not been accepted, the planning process does not take that forecast into account. If the Automatic Accept Forecast check box is cleared, you must accept the received forecast manually. To accept forecasts manually, use the Accept Forecast command in the Forecast by Revision from Customer (cpvmi0506m100) session or accept a range of forecasts in the Accept Forecast from Customer (cpvmi0206m000) session. If you do not select the Automatic Accept Forecast check box, you have more control over the received forecasts. For example, you can verify whether the forecast has not been increased in the frozen zone+ or decreased in the frozen zone-. Automatic Accept Confirmed Supply If this check box is selected, LN automatically
accepts any confirmed-supply message that you receive from your
supplier. As long as a confirmed-supply revision has not been accepted, the planning process does not take that confirmed supply into account. If the Automatic Accept Confirmed Supply check box is cleared, you must manually accept the confirmed supply. To accept the supply manually, use the Accept Confirmed Supply from Supplier (cpvmi0205m000) session. If you do not select the Automatic Accept Confirmed Supply check box, you have more control over the received confirmed supply. For example, you can verify whether the confirmed supply does not have receipt dates before the current date and you can verify whether the communicated delivery moments match the fixed delivery pattern agreed in the terms and conditions agreement.
| |||