Glossary for Enterprise Planningactual receipts The supply quantity that has already been received from the
goods flow, that is, from actual orders. The actual receipts are only recorded for the current plan period. These receipts have already been included in the inventory on hand. actual scenario The scenario that contains the operational master plan or order
plan, as opposed to scenarios used only for simulation, that is, what-if
analysis. The actual scenario is the only scenario from which you can transfer planned orders to the execution level. aggregation relationship A specification, expressed as a percentage, how items are
aggregated or disaggregated. To aggregate items means that different items are grouped to form product families for planning purposes. This is also called a planning bill of material. To disaggregate items means that a product family is split up into smaller families, or into items. Aggregation relationships can have the same structure as a single-level bill of material. However, similar to production bills of materials, also multilevel structures can be created. Example
allocation The reservation of inventory against a demand prior to the
outbound process. You can allocate a quantity of inventory to a business partner or a particular demand order. Note The documentation sometimes states that a particular demand object, such as a sales order, is allocated to a business partner, order, or reference. That phrase actually means that LN must fill the demand object with supply that was allocated to that particular business partner, order or reference. allocation rule The rule that defines how Enterprise Planning determines the quantity that must be supplied by a supplier or supplying
cluster. For example, a percentage of the total supply or the supplier's
capability to supply. allowed demand The maximum volume that you want to sell to customers in a
particular channel. When this maximum is reached in a certain channel ATP period, you accept no more customer orders for that
channel. ATP See: available-to-promise ATP See: available-to-promise ATP/CTP horizon The date until which LN performs ATP and CTP checks. The ATP horizon is expressed as a number of working days during which LN can carry out ATP and CTP checks. Beyond the ATP/CTP horizon, LN does not check ATP or CTP: all customer orders are accepted. automatic-update order group A group of planned orders, for which the criteria for inclusion
are stored. If you run the order planning process with the automatic-update feature activated, LN updates these order groups based on the stored selection criteria. available-to-promise The item quantity that is still available to be promised to a
customer. In LN, available-to-promise (ATP) is part of a larger extended framework of order promising techniques called capable-to-promise (CTP). If an item's ATP is insufficient, CTP goes beyond ATP in that it also considers the possibility of producing more than was initially planned. In addition to the standard ATP functionality, LN also uses channel ATP. This term refers to the availability of an item for a certain sales channel, taking into account the sales limits for that channel. For all other types of order promising functionality used in LN, the term CTP is used. Acronym: ATP Abbreviation: ATP capable-to-promise The combination of techniques used to determine the quantity of
an item that you can promise to a customer on a specific date. Capable-to-promise (CTP) involves an extension of the standard available-to-promise (ATP) functionality. CTP goes beyond ATP in that it also considers the possibility of producing more than was initially planned, when an item's ATP is insufficient. In addition to the standard ATP functionality, CTP comprises the following techniques:
Abbreviation: CTP capacity CTP The capacity of a resource that is available in a plan period
for additional production of a plan item in connection with a customer
order. The capacity CTP is used in capable-to-promise calculations. capacity CTP check An availability check on the capacity necessary to produce an
extra quantity of an item to deliver a customer order on time. The capacity CTP check is performed on resources in the item's bill of critical capacities or on the work centers of the item's routing, depending on the order horizon. Only the resources defined as CTP critical are checked. capacity CTP reservation Resource capacity reserved for the (as yet unplanned)
production of items for which the demand could not be covered by the ATP of the
items themselves. This reservation is made in the following situation:
If the demand for item A is recorded as a customer order, a capacity CTP reservation is recorded for resource R, and the resource's capacity CTP is reduced accordingly. capacity utilization The number of hours that a resource is used for
production. Alternatively, a percentage indicating the capacity use as a proportion of the total available capacity. channel ATP The item quantity that can still be promised to customers in a
particular sales channel. The channel ATP depends on the allowed demand for a channel. The total allowed demand for one channel ATP period forms the initial value of the channel ATP in that period. Every time a demand is recorded within this channel and within this channel ATP period, this demand is subtracted from the channel ATP. Channel ATP is used to limit the supply that goes to specific channels, and to secure that enough quantity is left to supply other important customers. channel ATP check A check on the quantity that can be promised to a customer
based on the allowed demand for the channel to which the customer
belongs. Note that the main purpose of channel ATP is to reserve a certain quantity of the product for other channels, for example, for strategic reasons. Example A customer belongs to the direct marketing sales channel. The allowed demand for this channel is 50,000 piece per period. A quantity can be promised to the customer, as long as the total sales volume for that channel in that period does not exceed 50,000. channel master plan An item-specific logistic plan that contains sales targets and
constraints for a specific combination of a sales channel and plan
item. A channel is a grouping of customers and items. A channel master plan supports sales-related functions such as demand forecasting and due-date quoting, as well as aggregation. cluster In Enterprise Planning, a grouping of warehouses connected to each other by
supplying relationships. A cluster represents a geographical location that consists of one or more warehouses. Enterprise Planning considers these warehouses as one unit for planning purposes. clustered item A plan item in Enterprise Planning that is linked to a particular
warehouse cluster. The inventory data for a clustered item represents only the
quantities related to that specific cluster. In the item code of a clustered item, the cluster segment contains the code of the cluster. You can use clustered items to model distribution planning within a site or between sites. The planning methods in Enterprise Planning use the total inventory of a clustered item in all warehouses in the cluster. Note that a cluster can also contain just one warehouse. COLT component CTP check An availability check on the components necessary to produce an
extra quantity of an item to deliver a customer order on time. The type of check that is performed on a component item itself depends on the CTP parameters for the component in question. The component CTP check is performed on components in the bill of critical materials or the bill of material, depending on the order horizon. Only components defined as CTP critical are checked. component CTP reservation The item quantity reserved to be used as critical components
for the (as yet unplanned) production of other items. This reservation is made when the ATP data in an item master plan is updated and the following is true:
In this case, a component CTP reservation is recorded for item B, and the ATP of item B is reduced accordingly. The quantity of item A that will be produced with the reserved quantity of the component is stored as CTP Reservation Receipts. Note To guarantee that LN can carry out an ATP check correctly, you must fill the Warehouse field in the Bill of Critical Materials (cprpd3120m000) session. LN explodes the ATP of a main item to plan items that have the same cluster as the warehouse you specified on the bill of critical materials of the main item. confirmed forecast The part of the total forecast which the customer definitely
expects to consume. If the customer sends the forecast by period to the supplier that plans the supply, the customer can differentiate between confirmed and unconfirmed forecast. Typically, confirmed forecast of a component is derived from actual sales orders and sales schedules of end item. The user can use various methods to determine how much of the forecast is confirmed forecast. See also unconfirmed forecast. confirmed stock The actual stock of a plan item in a VMI warehouse, as reported
by the supplier to the customer. In a vendor-managed-inventory situation, where the supplier is responsible for the supply planning of an item in a warehouse at the customer's site, the supplier keeps track of the inventory levels. In that case, the supplier informs the customer of the actual stock. confirmed supply Quantity of the item the supplier has confirmed will be
delivered to the customer on the planned delivery date. Note The confirmed supply can be less than the quantity requested by the customer. confirmed supply type The type of a confirmed-supply record that determines how that
supply is handled. Typical examples of confirmed supply types are:
Other confirmed supply types are To Release and Released. consumed demand forecast The part of the demand plan that has been consumed by the
actual demand in a specific period. As a rule, the demand forecast, extra demand, and special demand are gradually filled by actual orders. This process is referred to as consumption of forecast demand by actual demand. critical capacity requirements The production capacity of a resource, required by a plan item
for the execution of that plan item's production plan. The critical capacity requirements are based on a plan item's bill of critical capacities. The critical capacity requirements are specified by plan period. critical in CTP A plan item that is critical in CTP must be checked during a
component CTP check for a higher level item in the bill of critical materials.
A resource that is critical in CTP must be checked during a capacity CTP check
for a plan item, if this resource is included in the plan item's bill of
critical capacities. critical material requirements The quantity of a plan item that is required to serve as
critical components for the production of another plan item. The critical material requirements are based on the production plan for an (end) item, and on its bill of critical materials. The critical material requirements are specified by plan period. In the item master plan, critical material requirements are recorded as dependent material demand. CTP See: capable-to-promise CTP time fence The number of working days from the current moment, during
which LN does not
perform CTP checks. The CTP time fence must be smaller than the ATP/CTP horizon. During the period of the CTP time fence, CTP is considered to be zero. cumulative ATP The total item quantity that you can promise to deliver in a
particular plan period. You can use the cumulative ATP to check the availability of an item when you receive a sales order or an inquiry. Note If the item's cumulative ATP is insufficient, LN can carry out a capacity and/or component CTP check to see if the demand can be met by increasing the production of the item. cumulative capacity CTP The total resource capacity that is still available for
additional production up to and including a particular plan
period. cumulative order lead time The total value of the item purchase lead time and the
cumulative production lead time of all components. Enterprise Planning uses the cumulative order lead time to determine the minimum value of the planning horizon. Acronym: COLT customer deliveries The sales order quantities and the sales schedule quantities
that have already been delivered to the customers involved. The customer deliveries are part of the actual demand. These deliveries are used to consume the demand forecast, and to generate a new demand forecast. customer orders The sales orders that have not yet been delivered to the
customers involved. The customer orders are part of the actual demand and are used to consume the demand forecast. delivery schedule The dates and quantities of an item that can be promised to a
customer. With this report you can determine how much volume can be delivered on time and how much is delivered late. According to the item master plan, more chairs will be completed later that month. Some of those newly produced chairs have already been promised to other customers. Example A customer wants to order 80 office chairs, to be delivered on May 1. However, the CTP quantity on that day is only 30 chairs. demand forecast The item quantity that is forecast to be required in a plan
period. A demand forecast can be generated based on seasonal patterns or
historical demand data. The demand forecast is part of the demand plan for a plan item or channel. demand peg A relationship between a planned order, or an actual supply
order, and an item requirement that represents a definite commitment. You can only use the demand pegged supply for the pegged requirement, unless either of these conditions applies:
Related term: soft peg demand plan The expected demand for an item, specified by
period. The demand plan is the sum of The demand plan belongs to the master plan for an item or channel. dependent demand A demand related to a demand for another item. Two basic types of dependent demand exist:
With master planning, the dependent demand is equal to the sum of the following fields: LN explodes the ATP and the dependent demand of a main item to plan items that have the same cluster as the warehouse you specified on the bill of critical materials of the main item. dependent distribution demand Demand that comprises the following:
dependent material demand Demand for an item that results from the explosion of
requirements of a production plan or a planned production order for another
item. In other words, when requirements for an item's production plan or planned production orders are exploded, this leads to dependent material demand for items that occur in the former item's bill of (critical) material. dependent scheduled demand Demand that comprises the following:
distribution deliveries The quantity that has been delivered to other sites to meet
dependent distribution demand. distribution plan The item quantity that is planned to be delivered by internal
or sister-company suppliers. These planned deliveries are shown in the item
master plan as planned distribution orders (outside the order horizon). The distribution plan belongs to the supply plan for a plan item. efficiency factor A variable that LN uses to take into account differences in the daily availability of
a resource when, for example, working overtime, hiring extra man craft, or
working in different shifts. Efficiency factors impact on lead-time calculation
in Enterprise Planning. enterprise resources planning An information-processing system to control the production and
distribution of goods, including financial accounting. Abbreviation: ERP ERP exception message A short standardized message that LN generates to advise
the user to change or correct a specific planning parameter, value, or
constraint to avoid undesired results or conflicts in planning. exception message horizon The number of days for which Enterprise Planning generates exception messages of a certain type. The exception message horizon is expressed as a number of working days from the date you carry out the simulation. Beyond the exception message horizon, Enterprise Planning does not generate exception messages of the exception message type involved. execution level Within Enterprise Planning, the designation of the LN packages that
control the execution of orders and the actual goods flow, such
as:
Enterprise Planning uses planning algorithms to carry out simulations and optimizations. The other packages control the execution of orders, and the goods flow. extra demand An extra item quantity that is expected to be sold in a plan
period, on top of the regular demand forecast. The extra demand is part of the demand plan for a plan item or channel. Example An extra demand can be defined for an unusual large customer order or an extra market demand because of sales promotions. extra lead time Time reserved for extra activities that are necessary to fully
complete a planned order. Enterprise Planning treats the extra lead time in the same way as the safety time: the order must be delivered earlier based on the extra lead time. The extra lead time is expressed in days or in hours. family CTP check A CTP check that is carried out at a higher product-family
level, instead of the level of the item itself. Like the regular CTP check for an item, a family CTP check can involve several types of ATP and CTP checks. In this case, you can configure LN so that, when the CTP of the mountain bike must be checked, LN will in fact check the CTP of the bicycle family. Example The mountain-bike item is part of the bicycle family. family CTP horizon The time period for which LN performs the
capable-to-promise (CTP) check for an item on a higher product-family level,
instead of the level of the item itself. The start date of the family CTP horizon is defined in the plan-item settings. The end date coincides with the CTP time fence. The application of family CTP depends on the plan period in which the delivery date of a customer order falls:
family item A product family of an item that represents a group of similar
plan items (or families). The items are aggregated to the level of the family
item to give a more general plan than the one devised for individual
items. The aggregation relationships specify the percentage of each plan item in the product family. Synonym: product family family site The logistic company in which an item family has been
defined. The family site makes it possible to redirect CTP checks to a central logistic company. When a customer order is received, the CTP is checked at the family level in the central site. Example A large manufacturer of sports articles produces baseball bats in several states. A central master plan is maintained at headquarters (the central site). Each site has the bat defined as an item, and aggregation relationships have been set up to a product family of baseball bats at the central site. firm-planned order A planned order that can no longer be modified by Enterprise Planning in an
order-planning run. However, you can manually change a firm-planned order's
start date and finish date, or the order quantity. fixed delivery code A code that identifies a collection of fixed dates and times on
which external suppliers and internal suppliers are expected to make their
deliveries to your address. For each plan item you can select the appropriate fixed delivery code. fixed delivery moment A specific date and time that you define as a firm and
unchangeable time point on which goods must be delivered to you. If you defined fixed delivery moments for a plan item, LN sets the unconstrained planned finish date back to the nearest fixed delivery moment. You can define incidental fixed delivery moments, or define a pattern of recurring fixed delivery moments. fixed delivery pattern A schedule of recurring fixed delivery moments. Enterprise Planning uses calendar recurrences to create fixed delivery patterns. fixed lead time The estimated time necessary to carry out a planned
order. To plan an order's lead time, Enterprise Planning can either use a fixed lead time or more detailed routing data. When using a fixed lead time, the results are less precise, but the calculation is faster. fixed lead-time horizon The time period for which Enterprise Planning uses a
fixed lead time to plan orders. Planning with a fixed lead time is faster than planning on the basis of routing data, but the results are less precise. The start date of the fixed lead-time horizon is defined in the plan-item settings. The end date coincides with the end of the order horizon. Before the fixed lead-time horizon, Enterprise Planning plans on the basis of routing data. Within the fixed lead-time horizon, Enterprise Planning plans using a fixed lead time. forecast The demand for an item, calculated by the customer that
purchases that item, and aggregated to forecast periods according to the agreed
terms and conditions. The customer sends the forecast to the supplier that plans the item supply. forecast horizon The number of days into the future on which the calculation of
the inventory plan is based. The forecast horizon is expressed as a number of calendar days. The forecast-based calculation of the inventory plan is based on the following principle: The inventory plan must be equal to the expected demand during a certain forecast horizon. Example If the forecast horizon is 10 days, LN aims at an inventory level for each plan period that is sufficient to cover the demand for the next 10 days. forecast period The periods to which the customer aggregates forecast caused by
multiple orders. The forecast periods are based on the terms and conditions. forecast time fence The date up until which Enterprise Planning ignores
the demand forecast when generating master plans and planned orders. In the
first few days after the current date, LN expects to receive
no more sales orders than the actual sales orders that you already
received. goods flow A collective term for all transactions that influence the
inventory of items, such as customer orders, production orders, and inventory
adjustments. Goods-flow data is recorded at the execution level of LN. When the goods-flow data in Enterprise Planning is updated, this data is loaded into Enterprise Planning as a basis for the planning. This data includes both historical and planned goods-flow transactions, as well as current inventory data. For product families, LN generates the goods-flow data by aggregation through the aggregation relationships. independent demand A demand that is unrelated to demand for other
items. Examples of independent demand:
infinite planning A supply-planning method that does not take any capacity
constraints or material constraints into account. Infinite planning starts from the assumption that there are no critical constraints. In other words, it assumes that it is always possible to find or arrange the necessary resource capacity and the necessary materials to produce an item. Infinite planning is especially suitable in situations in which it is no problem to flexibly add resource capacity, and in which the supply of components is easy. internal deliveries The quantity that has been delivered internally, that is,
within the same site, to meet dependent demand. inventory plan The desired inventory level, specified by period. The inventory plan is part of the item master plan. The inventory plan can also be a constant inventory level. item customer plan A time-phased overview of the demand and supply for an item
related to a specific customer. LN provides item customer plans to work with vendor managed inventory. The item customer plan displays data such as the forecast your customer sent to you and the confirmed supply information you sent to your customer. You can compare an item customer plan with an item order plan. The difference is, that the item order plan displays demand and supply from all suppliers or customers and the item customer plan displays demand and supply for a specific customer. item master plan An item-specific, overall logistic plan that contains planning
data and logistic targets for sales, internal and external supply, and
inventory. All planning data in the item master plan is specified by plan
period. Enterprise Planning uses this data to carry out master-planning simulations. Within the item master plan, you can distinguish the following subplans: In addition, an item's master plan contains information about actual demand, actual supply, planned supply in the form of planned orders, and expected inventory. If an item has a master plan and channels have been defined for this item, each channel usually has its own channel master plan. A channel master plan contains channel-specific information only, that is, demand data and information about sales restrictions. Item master plans and channel master plans are defined within the context of a scenario. These scenarios can be used for what-if analyses. One of the scenarios is the actual plan. item order plan A time-phased overview of your order planning. The item order plan contains overview values for demand and forecast on one hand, and the other hand it provides information about scheduled receipts (actual orders) and planned supply (planned orders). item supplier plan A time-phased overview of the demand and supply for an item
related to a specific supplier. LN provides item supplier plans to work with vendor managed inventory. The item supplier plan displays data such as the forecast you sent to the supplier and the confirmed supply information the supplier sent back to you. You can compare an item supplier plan with an item order plan. The difference is, that the item order plan displays demand and supply from all suppliers and customers and the item supplier plan displays demand and supply for a specific supplier. iteration A master planning method used by the workload-control planning
engine to take into account material constraints and pass them on from the
lower to the higher levels in the bill of critical materials (BCM). An iteration consists of:
line assembly configuration (LAC) A planning product for assembly-driven manufacturers, for
example, the automotive industry. The main functionality of LAC is assembly
line planning for generic FAS items. In LAC, a fast MRP engine calculates the requirements for assembly parts that must be supplied to the assembly line. The planning of the assembly parts themselves is carried out by Enterprise Planning. LAC calculates the requirements, based on forecast and actual sales orders, and replicates the requirements to Enterprise Planning. master-based planning A planning concept in which all planning data is accumulated
into time buckets with predefined lengths. In master planning, all demand, supply, and inventory data is handled in terms of these time buckets, and is stored in master plans. In master planning, supply is planned in the form of a supply plan. This supply plan is calculated on the basis of demand forecasts, actual orders, and other information. For production planning, this planning method only considers critical requirements, as recorded in an item's bill of critical materials and bill of critical capacities. Note In Enterprise Planning, you can maintain a master plan for an item, even if you plan all supply with order planning. master-planning engine The planning algorithm used in master planning to plan
supply. The master-planning engine generates a supply plan for each item involved. The following master-planning engines are available:
For each plan unit, you can choose the appropriate planning engine. If an item has not been assigned to a plan unit, infinite planning is used by default. master-planning horizon That part of the planning horizon which falls outside the order
horizon, and for which Enterprise Planning uses master planning to plan supply. The master-planning horizon is not defined on its own, but depends on the definition of the order horizon and the planning horizon. If the order horizon coincides with the planning horizon, there is no master horizon. In this case, Enterprise Planning plans all supply with order planning. minimum standard cost The minimal price for obtaining 1 unit of an item. A price limit that you can define for a exception message type in Enterprise Planning. If you define a minimum standard cost for a certain exception message type, Enterprise Planning does not generate the corresponding exception message for items that cost less than the minimum standard cost. multicompany distribution order A distribution order in which two separate logistical companies
are involved. In LN, the user can determine if the multicompany planned distribution must be transferred to either a purchase order, or a warehouse transfer. To do so, the user must define the order type for a specific company relation. net change date The date on which something changes that affects the current
master plan or the current planned orders. For example, a higher demand or a
change in a BOM. When a net-change simulation is performed, then items are selected based on the net-change date and flag. For example, when the flag is set and the date is outside the order horizon, then the item is skipped. Net-change planning net-change simulation A recalculation of planned orders or a master plan that starts
at the earliest change in the planning data since the last
simulation. Example Suppose, you did a regenerative planning on May 1, and then, a BOM is modified for item Y, effective on June 1. As a result, LN sets the net-change date to June 1. In that situation, a net-change simulation only replans item Y for the period starting on June 1. Synonym: Net-change
planning Antonym: Regeneration nettable warehouse A warehouse that is usually provisioned by production or
purchase. The distinction nettable-nonnettable is not used anymore in the current version. nonclustered item A plan item in Enterprise Planning that is planned without
referring to a particular warehouse cluster. In the item code of a nonclustered item, the cluster segment is empty. If clustered items exist that have the same item-base segment as the nonclustered item, these items are physically identical, but the inventory data differs (for example, the quantity on hand). The inventory data for a nonclustered item does not include the quantities related to specific clusters. You can use clustered items to model distribution planning within a site or between sites. If LN is installed without cluster segments, all plan items are nonclustered items. nonconsumed demand forecast The part of the forecast demand that has not yet been consumed
by actual demand. As a rule, the demand forecast, extra demand, and special demand are gradually filled by actual orders. This process is referred to as consumption of forecast demand by actual demand. noncritical COLT noncritical cumulative order lead time The total value of the item purchase lead time and the
cumulative production lead time of all noncritical components. Enterprise Planning uses the noncritical cumulative order lead time to determine the minimum value of the order horizon. Acronym: noncritical COLT nonnettable warehouse A warehouse that is usually provisioned by distribution, that
is, by other warehouses at the same site or at a related site. The distinction nettable-nonnettable is not used anymore in the current version. operation storage horizon The number of future working days for which LN stores the operations
for planned orders. For planned orders beyond the operation storage horizon, you cannot analyze the capacity use of planned orders and you cannot transfer the planned orders to the execution level. order-based planning A planning concept in which planning data is handled in the
form of orders. In order planning, supply is planned in the form of planned orders. LN takes into account the start and finish dates of individual planned orders. For production planning, this method considers all material and capacity requirements, as recorded in an item's BOM and routing. Note In Enterprise Planning, you can maintain a master plan for an item, even if you plan all supply with order planning. order group A collection of planned production orders, which you can use as
a selection criterion to transfer planned production orders from Enterprise Planning to the Job Shop Control module
of Manufacturing. JSC can use the same collection of production orders to organize manufacturing tasks. order horizon The time period for which Enterprise Planning uses
order-based planning to plan supply. The order horizon is expressed as a number of working days from the date you carry out the simulation. If the order horizon is zero, Enterprise Planning does not use order-based planning for the item involved. To calculate the order horizon, LN uses the calendar that you specified for the enterprise unit of the default warehouse to which the plan item belongs. If you did not specify an enterprise unit for the default warehouse of the plan item, Enterprise Planning uses the company calendar to calculate the order horizon. Note LN moves the order horizon towards the end of the plan period) in which it falls, because Enterprise Planning must know whether a plan period falls within the order horizon. order status The status assigned to a planned order in Enterprise Planning. The order status can either be:
performance indicator A value that indicates how well a particular aspect of a
certain scenario in Enterprise Planning performs. This figure concerns a specific resource, a range
of resources, a specific plan item, or a range of plan items. The figure
involved can represent a quantity, an amount of money, or a percentage. Performance indicators are especially useful to compare different scenarios, resources, or plan items. phase number A number that determines the order in which plan units and plan
items are planned. As a rule, plan units and plan items are planned in order of increasing phase number: first phase number 0, then phase number 1, and so on. An item has separate phase numbers for master planning and order planning. For items that belong to a plan unit, the master phase-number equals the plan unit's master phase-number. planned distribution order An order in Enterprise Planning for an internal supplier or
sister company to deliver a quantity of an item. planned order A supply order in Enterprise Planning that is created for planning
purposes, but which is not an actual order yet. Enterprise Planning works with planned orders of the following types: Planned orders are generated in the context of a particular scenario. The planned orders of the actual scenario can be transferred to the execution level, where they become actual supply orders. planned production order A planned order in Enterprise Planning to produce a certain quantity
of an item. planned purchase order A planned order in Enterprise Planning to purchase a certain quantity
of an item from a supplier (buy-from business partner). planned requirement date The date for which LN identifies a material requirement. If the projected inventory at that date is less than the required quantity, the planning engine generates a planned order or a reschedule-in exception message. The planned requirement date of a manually entered planned order is equal to the planned order's finish date. planning horizon The time period for which LN maintains planning
data for an item. The planning horizon is expressed as a number of working days from the date you carry out the simulation. Enterprise Planning does not generate supply plans or planned orders that are after the item's planning horizon. To calculate the planning horizon, Enterprise Planning uses the calendar that you specified for the enterprise unit of the default warehouse to which the plan item belongs. Note Enterprise Planning moves the planning horizon to the end of a plan period. plan period One of a series of time buckets into which all planning data in
a master plan is accumulated. Plan periods are defined in the context of a scenario. Plan periods are identified by a period number, and are defined in days, weeks, or months. plan site A business location or logistic organization with its own
logistic plan, which is centrally coordinated by a multisite scenario. plan status An indication of whether the data in a scenario can still be
changed. The plan status can be Open or Closed. When a scenario has the Closed plan status, you can no longer modify it. plan unit A group of plan items that is planned as a single unit. A plan unit groups a set of plan items that share the production capacity of certain resources. A plan unit is planned with a specific planning engine. You can specify a planning method and planning parameters for each plan unit. A plan unit often corresponds to a production department. Usually, a production system distinguishes no more than three to five plan units. priority rule The rule on which Enterprise Planning bases the choice of suppliers. For
example, the costs, supply time, or the priority of the supplier. product family See: family item production plan The planned receipts of manufactured items, specified by
period. These receipts are the quantity that must be produced internally. Note that the production plan does not include the quantity of the plan item that is delivered by other sites or warehouse locations. The production plan is part of the supply plan for a plan item. projected inventory The expected inventory level at the end of a plan
period. Note that the projected inventory of plan periods that are entirely in the past equals the inventory on hand. purchase plan The item quantity that is planned to be delivered by external
suppliers, specified by period. The purchase plan belongs to the supply plan for a plan item. Note the distinction between purchase plan and distribution plan. The distribution plan covers the volume to be delivered by internal or sister-company suppliers. Note LN uses the purchase plan to create planned orders, and not to purchase schedule quantities. reference date A date that determines when a rolling scenario is shifted
forward in time. Example
On or after January 19, the scenario is shifted forward 14 days. The new reference date will be January 19. Regeneration release time fence The date until which you want to be able to transfer planned
production orders for a particular plan item to Manufacturing. The release time fence is expressed as a number of working days from the date you carry out the simulation. Enterprise Planning needs operation data to transfer planned production orders to Manufacturing. As a rule, Enterprise Planning stores operation data for a planned order only if the order's start date falls within the plan item's release time fence. replenishment plan A schedule of dates, times, and quantities for the delivery of
items. The supplier creates the replenishment plan and sends the replenishment plan to the customer. resource A group of machines or employees in Enterprise Planning,
corresponding to a work center in other LN packages. Each operation performed to manufacture an item requires a certain capacity amount from a resource (for example, production hours). The capacity of the resource can be a constraint in the planning. The availability of a resource can be specified by using the resource calendar. resource master plan A time-phased overview of the capacity use at a certain
resource. In a resource master plan, the following types of capacity use are recorded per plan period:
In addition, the resource master plan contains capacity CTP information. resource order plan A period based overview of the capacity utilization of a
specific resource and of the orders that require resource
capacity. The resource order plan can contain the following order types/entities:
resource planning horizon The time period for which LN performs resource
planning. You can see the results of this planning in the resource master plan. revision The revision number linked to the messages that communicate
demand and supply data between customer and supplier. A business partner can send multiple revised versions of messages with demand and supply data. Each revised version gets a revision number that has been incremented by one. The customer generates the revision numbers. The supplier uses the same revision to mark a corresponding message to the customer. rolling frequency The number of days after which a rolling scenario is shifted
forward in time. The number of days by which a plan is shifted forward equals the value of the scenario's rolling frequency. Note that the rolling frequency is defined in calendar days. Example If the rolling frequency is seven days, the scenario will be shifted forward seven days, every seventh day. rolling scenario A particular type of scenario that is shifted forward in time.
You can specify a rolling frequency to determine the number of days after which LN must roll the
scenario. In the course of time, the current date will reach or exceed a certain reference date plus the rolling frequency. When this is the case, the scenario's start date and finish date, the plan period division, and the reference date itself are shifted forward. scenario The identification of an overall planning solution. Each scenario represents one overall planning solution, and involves particular settings for the planning of items and resources. You can use scenarios to analyze and compare various planning options and to find the best planning solution. For example, you can vary demand forecasts or sourcing strategies. One of the scenarios is the actual scenario, which corresponds with the actual planning situation. You can only transfer planned orders and production plans from the actual scenario to the execution level of LN. scheduled distribution receipts The quantity scheduled to be received from the orders created
when planned distribution orders are transferred to the execution level, (that
is, transfer orders and/or purchase orders. scheduled production receipts The quantity scheduled to be received from (actual) production
orders. scheduled purchase receipts The quantity scheduled to be received from (actual) purchase
orders and purchase schedules. soft peg A relationship between an item supply and an item requirement
that LN stores for
informational purposes. If you replan an item, you lose the related soft pegs.
In Enterprise Planning, the term pegging is generally used to denote soft pegs. Related term: demand peg source allocation rule The rule that defines how a required volume is divided over the
following sources of supply:
The source allocation rule is either Percentage or Priority. sourcing strategy The subdivision of the planned supply of a plan item over the
following sources:
Sourcing strategies are defined within the context of a scenario. You can define sourcing strategies for clusters, item groups, and plan items. special demand An extra item quantity that is expected to be sold in a plan
period, on top of the forecast demand, and for a specific reason. For example,
a special sales action. You can view and maintain special demand in the Special Demand by Item (cpdsp2100m000) session. Here you can also record a reason for each instance of special demand. The assembly-part demand forecast from Configurator is also stored as special demand. The special demand is part of the demand plan for a plan item or channel. specification A collection of item-related data, for example, the business
partner to which the item is allocated or ownership details. LN uses the specification to match supply and demand. A specification can belong to one or more of the following:
supplying relationship A distribution link between a supplying warehouse cluster and a
receiving cluster. The clusters involved can be in the same site, or in
different sites. Enterprise Planning uses supplying relationships for distribution planning: the supplying relationships represent valid supply paths for particular items or groups of items. You can specify supplying relationships at the level of individual items, but also at more general levels. The supplying relationships also determine the costs of supply, lot size rules, and other parameters. supplying site The site from which a plan item is delivered through the
multisite distribution structure. supply plan The total supply that is planned in master planning. The supply plan of an item consists of:
The item master plan also takes into account the supply planned in order planning (planned orders). However, this type of supply is not part of the item's supply plan. In other words, a supply plan usually exists only outside the item's order horizon. supply strategy The methods by which the supply of plan items is divided over
multiple suppliers. The supply strategy defines the priority rules and allocation rules that direct the planning engines in the choice of suppliers. There are separate supply strategies for:
You can define supply strategies for clusters, item groups, and plan items. supply type In LN,
the type of supplier (internal or external) for which a supply strategy is
used. LN uses internal suppliers to generate distribution orders, and external suppliers to generate purchase orders. time fence The date until which an item's supply plan and planned orders
are frozen. The time fence is expressed as a number of working days or working hours from the date you carry out the simulation. As a rule, Enterprise Planning does not regenerate the supply plan or the planned orders within the time fence. However, you can overrule this behavior when you run a master-plan simulation or order simulation. The time fence is meant to prevent:
Usually, the lead time of an item's production process is a reasonable value for the time fence. unconfirmed forecast The part of the total forecast for which the customer desires a
supply in addition to the confirmed forecast. Possibly, the customer is unsure
whether this quantity will be needed. The sum of the confirmed forecast and the unconfirmed forecast is the total forecast. Typically, the total forecast includes not only the demand based on actual sales orders for the customer's end products, but also forecast demand based on estimated future sales of the customer's end products. See also confirmed forecast. VMI requirement type The type and origin of the requirements on which LN can base an item
supplier plan or an item customer plan in a vendor-managed-inventory situation.
Depending on the requirement type, LN uses different demand data to calculate how much
of an the item is planned to be available in each period. The VMI requirement type can have the following values:
VMI supplier The supplier (buy-from business partner) that handles the
inventory management and optionally the supply planning of a particular item
for a customer. This term is used in a vendor managed inventory (VMI) setup. A terms and conditions agreement can designate a particular supplier as the VMI supplier for an item. WLC See: workload control workday A day on which work can be performed. Lead times, horizons, and time fences in Enterprise Planning are defined in workdays (except for the forecast horizon). Enterprise Planning converts workdays to working hours, minutes, and seconds on the basis of the basic day capacity. workload The amount of work scheduled for a resource. The term workload is used in the following contexts:
workload control A constraint-based method for supply planning, aimed at
creating a feasible planning solution by leveling the workload on a
resource. Workload control is based on the idea that workload levels and production lead times are related. This method is used to control both the workload by resource and the lead time per item. Abbreviation: WLC workload norm The amount of work that must await execution in job shop for a
resource. If the workload is much lower than the workload norm, there is a risk that the resource becomes idle. If the workload is much higher, the production lead times can become unacceptably long. Note The workload norm is expressed in hours. workload tolerance The percentage by which the resource's workload is allowed to
deviate from the workload norm.
| |||||||||||||||||||