A model that represents a specific organization.
. A project model is built from a library (repository) of the following model items:
- business-control model
- business-function model
- business-process model
评估参数设置规则(项目模型) (tgbrg4230m000)使用此进程以 import parameters and set their value based on the parameter-setting rules that were defined in the 规则 (tgbrg7500m000) session. The value of the parameter is set if the following condition is met: the parameter is used in a parameter-setting rule
项目模型 A model that represents a specific organization. . A project model is built from a library (repository) of the following model items:
Project Model The description or name of the
project model. 版本 A group of model items that share some characteristics, such as
the customer, owner, and effective date. Version The description or name of the
version. 优化阶段 A phase in the business-improvement cycle in which new business
functions and business processes are implemented in an organization.
Optimization Phase The description or name of the
optimization phase.
试运行
如果选中此复选框, a report with the
hypothetical outcome of the current session run is printed. The
parameters are not actually
imported and set. 清除现有模型
如果选中此复选框, the parameters that are
already present in the project model but do not meet the conditions of the
parameter-setting rules are
removed from the
project model. 如果清除此复选框, the parameters that are already present in the project model but do not meet the conditions of the parameter-setting rules remain in the project model. 改写
如果选中此复选框, the
parameters that are already
present in the project model and meet the conditions of the
parameter setting rules
receive the value that is derived from the parameter setting rule. Therefore,
if the current value of that parameter is different from the value that is
derived from the setting rule, the latter value is applied. 打印
如果选中此复选框, the outcome of the
current session run is printed.
评估 If you click this button (or command), the rules are
implemented.
| |||