Groups for Service Orders and Work Orders (tsspc3100m300)

Use this session to view and modify group planning data for service orders and work orders.

Note

You can use this session only when the Use Assignments in Work Orders check box is selected in the Work Order Parameters (tswcs0100m000) session.

 

Start Date Groups

The start date of the group. Infor LN displays the details of the groups with a start date later than the specified date.

Finish Date Groups

The finish date of the group. Infor LN displays the details of the groups with a finish date earlier than the specified date.

Assigned Engineer

The code of the assigned engineer to filter the group data.

Group

The unique ID of the group.

Activity Origin

The origin of the activity.

Allowed values

Activity Origin

Check Resources for Attribute Values

If this check box is selected, Infor LN allocates resources for the service order, work order, or planned activity based on the attribute values.

Check Resources for Skills

If this check box is selected, Infor LN allocates resources for the service order, work order or planned activity based on the skills.

Check Resources for Availability

If this check box is selected, Infor LN checks the availability of resources for the service order, work order, or planned activity.

Minimum Availability Percentage

The minimum availability percentage of the resource for the allocation.

Group Status

The least possible status of all the activities in the group.

Maximum Order Activity Status

The highest possible status of service order that is assigned to the group.

Frozen

If this check box is selected, the group is frozen and you cannot add new groups to the existing groups.

Firm Planned

If this check box is selected, the group is firm planned and you cannot modify the start and finish date of the group.

Sort Method

The sorting method for the service order activities, work order activities or the planned activities in an activity set.

Allowed values

Sort Method

Keep Sequence of Activity Sets

If this check box is selected, Infor LN does not change the sequence of the activity sets when the specified group is planned.

Planned Start Time

The start date and time of the first activity set in the specified group.

Planned Finish Time

The finish date and time of the last activity set in the specified group.

Plan Method

The method to plan the service order activities, work order activities or the planned activities.

Allowed values

Plan Method

Start Address of Route

The address of the starting point of the route.

Note

This field is enabled only if the Plan Method field is set to Planning Based on Route.

Average Travel Speed

The average travel speed used to calculate travel time when planning a route.

Note

This field is enabled only if the Plan Method field is set to Planning Based on Route.

Unit

The unit of measure used to express the average travel speed.

Travel Offset Time

The time used to calculate travel time when planning a route.

Note

This field is applicable only if plan method is set to Planning based on route.

Unit

The unit in which the travel offset time is expressed.

Respect Earliest Start Time

If this check box is selected, Infor LN considers the earliest start time to plan the service order activities, work order activities or the planned activities.

Note

For a service order activity, the planned start time must not be planned after the earliest start time.

Respect Latest Finish Time

If this check box is selected, Infor LN considers the latest finish time to plan the work order activities or the planned activities. The Planned Finish Time cannot be planned after the Latest Finish Time. The service order activity is not planned.

Note

LN re-plans the route for the activity.

Respect Material Availability Date

If this check box is selected, LN considers the Material Availability Date specified in the Resource Planning Parameters (tsspc0101m000) session, to schedule the service/work order activities in a Group Set.

Note
  • This field is visible only if the Check Material Availability check box in the Service Order Parameters (tssoc0100m000) session or the Check Material Availability check box in the Work Order Parameters (tswcs0100m000) session is selected.
  • This field is disabled if the Firm Planned check box is selected.
Total Activity Duration

The cumulative duration of activities for all the activity sets in the group.

Total Travel Duration

The cumulative duration of travel for all the activity sets in the group.

Total Travel Distance

The cumulative travel distance of all the activity sets in the group.

Unit

The unit of measure used to express the total travel distance.

Assigned Engineer

The engineer assigned to the specified group.

 

Initialize

Populates the data in the Start Date Groups field.

Initialize

Populates the data in the Finish Date Groups field.

Remove Assigned Resources

Deletes all the resources assigned to the selected order.

Split Group

Splits the selected group into activity sets.

Show All

Displays all the groups defined for all the orders.