Group Sets for Service Orders (tsspc2190m000)

Use this session to view and maintain group sets generated from group planning activity sets for service orders.

 

Start Date Groups

The start date of the group set. LN displays the group sets with a start date later than the specified date.

Finish Date Groups

The finish date of the group set. LN displays the group set with a finish date earlier than the specified date.

Group Set

The unique ID of the group set.

Activity Origin

The origin of the activities in the group sets for service order. By default, the value is set to Service Order.

Allowed values

Activity Origin

Target Number of Groups

The number of groups you create for the group set.

Note

The value in this field is defaulted from the Attribute Group - Preferred Resources (tsspc0120m100) session.

Existing Number of Groups

The number of groups available for the group set.

Workload Leveling Method

The method to level the workload for group planning.

Initialize Center of Gravity

If this check box is selected, the center of gravity must be re-calculated during each iteration.

Number of Iterations

The number of iterations to be performed by the territory planning engine for the service orders. A maximum of 10 iterations can be performed. The default value is five.

Note

This field is enabled only if the Workload Leveling Method is set to Geographically.

Lower Limit Standard Deviation of Work Load

The lower limit you set as the standard deviation. The planning engines perform the workload leveling geographically to reset the total of activity duration and travel duration across groups until the standard deviation is reached.

Unit

The measurement unit for Lower Limit Standard Deviation of Work Load. The deviation is expressed in the Time Duration Unit set in the General Service Parameters (tsmdm0100m000) session.

Maximum Indicative Length of Route

The maximum indicative length of the route calculated by the planning engineer when workload leveling is performed. The maximum value can be set up individually for each group of attribute values. This calculation helps avoid long routes.

Unit

The measurement unit for Maximum Indicative Length of Route. The length of route is expressed in the Distance Unit set in the General Service Parameters (tsmdm0100m000) session.

Sort Method

The method to sort the service order activities in a group set.

Note

This value is defaulted from the Service Planning Parameters (tsspc0100m000) session.

Allowed values

Sort Method

Plan Method

The method to plan the service order activities in a group set.

Note

This field is enabled only if the Activity Origin is set to Service Order or Planned Activity.

Allowed values

Plan Method

Respect Earliest Start Time

If this check box is selected, LN considers the earliest start time to plan the service order activity.

Note

The value in this field is defaulted from the Respect Earliest Start Time field defined in the Service Planning Parameters (tsspc0100m000) session.

Respect Material Availability Date

If this check box is selected, LN considers the Material Availability Date specified for the service orders in the Service Planning Parameters (tsspc0100m000) session, to schedule the service order activities in a Group Set.

Note
  • This field is visible only if the Check Material Availability check box in the Service Order Parameters (tssoc0100m000) session or the Check Material Availability check box in the Work Order Parameters (tswcs0100m000) session is selected.
  • This field is applicable if the Workload Leveling Method is set to Scheduling.
  • This check box is selected if the Respect Material Availability Date check box for the service/work order is selected in the Service Planning Parameters (tsspc0100m000) session and:
    • The Activity Origin is set to Service Order/ Work Order.
    • The Workload Leveling Method is set to Scheduling.
  • This check box is not selected if the Activity Origin is set to Planned Activity or the Workload Leveling Method is set to Geographically.
Planned Start Time

The planned start date and time of the first activity in the specified group set.

Note

The value in this field is defaulted from the groups (defined in Groups for Service Orders (tsspc3100m000) session) linked to the group set.

Planned Finish Time

The planned finish date and time of the last activity in the specified group set.

Note

The value in this field is defaulted from the groups (defined in Groups for Service Orders (tsspc3100m000) session) linked to the group set.

Total Activity Duration

The cumulative duration of travel for all the activities in the group set.

Note

The value in this field is defaulted from the groups (defined in Groups for Service Orders (tsspc3100m000) session) linked to the group set.

Total Travel Duration

The cumulative duration of travel for all the group in the set.

Note

The value in this field is defaulted from the groups (defined in Groups for Service Orders (tsspc3100m000) session) linked to the group set.

Total Travel Distance

The cumulative distance of travel for all the activities group in the group set.

Note

The value in this field is defaulted from the groups (defined in Groups for Service Orders (tsspc3100m000) session) linked to the group set.