To create a physical breakdown from a project-breakdown structureYou can create a physical breakdown structure by copying from a Project structure with the underlying Element or Activity structure and the material lines of the specific structure. In this process, you can also copy the material lines that underlie any of the elements or activities that are copied. You can create a physical breakdown from a project-breakdown structure in the Copy Project Breakdown Structure (tscfg2210m200) session. In this session, you can create the physical breakdown from: Note You can only use this session if Project is implemented. To create a physical breakdown from a project-breakdown structure, take the following steps: Step 1. Project field Enter or select the project. For the entered project, the value of the Project Package Link field in the General Projects (tcmcs0552m000) session, must be Project ( Project). If you use free projects, note that the changes made to the project after you have copied the project, are not processed to Service. Step 2. Origin Structure field Select from:
Step 3. Installation Group field Enter the code of the Installation group that the newly-created physical breakdown belongs to. LN creates an Installation in the Installations (tsbsc1110m000) session that specifies the newly-created top-serialized item. You can specify the default installation group in the Project and in that scenario, this value is automatically defaulted from the project.
| |||