The code that identifies the project for which the current equipment cost objects are defined.
Project Equipment (tppdm6512m000)Use this session to list project-specific equipment cost objects, which you can define and modify in the Project Equipment (tppdm6112s000) session. These differ from standard equipment cost objects in that they refer to a particular project. Equipment cost objects represent the equipment you need to perform project tasks. Note If you want to list standard equipment cost objects, use the session
Project The code that identifies the project for which the current equipment cost objects are defined. Description The description or name of the code. Status The status of the project. Equipment The code that identifies the cost object. Description The description or name of the code. Search Key The search key associated with the cost object. Control Code The control code associated with the cost object. The control code can be a standard cost object or a project-specific cost object. ref.type The reference type indicates whether the control code is a standard or a project related labor.
Cur The currency for the cost price. Cost Rate The cost rate. Text If this check box is selected, a text is present.
| |||