Publish Project Data (tpbod0200m000)Use this session to publish LN Project data to Infor ION for transfer to other software applications. The following Project data can be published:
If errors occur during the publication process or if other software applications require a new set of data, you can run this session again. Note
Options Mode Size The number of records that must be simulated. If you enter a value of 100, the first 100 records that fall within the selection criteria must be simulated. Default value The default value is zero, which means all records that fall within the selection range are simulated. Note This field is enabled only if the Mode field is set to Simulate Selection Range Company The company range for which the data must be published. Settings Use Verb Specify the type of BODs that must be published. Allowed values Note This field is enabled only if the Mode field is set to Simulate. Logical ID(s) Show BODs do not use ION routes and are sent directly to other applications. Use this field to specify the logical ID(s) of the receiving application. Note This field is enabled only if the Use Verb field is set to Use Show Verb. Logging Logging If this check box is selected, published BODs are logged. Output Specify the log output. Allowed values Note This field is enabled only if the Logging check box is selected. Single XML-file per BOD If this check box is selected, a separate log file is generated for each published BOD. If this check box is cleared, one log file is generated with the xml of all published BODs. Note This check box is only available if the Output field is set to BOD. Location The server or client to which the output files must be written. Note This field is enabled only if the Logging check box is selected. Directory The directory on the server or client to which the output files must be written. Note This field is enabled only if the Logging check box is selected. ProjectMaster ProjectMaster If this check box is selected, projects with their activity structure are published. ProjectExtension ProjectExtension If this check box is selected, extensions are published. LaborCostMaster Standard If this check box is selected, standard labor cost objects are published. Project If this check box is selected, project-specific labor cost objects are published. SundryCostMaster Standard If this check box is selected, standard cost objects relating to sundry costs are published. Project If this check box is selected, project-specific cost objects relating to sundry costs are published. ProjectBalance ProjectBalance If this check box is selected, cost control by activity is published. ProjectPeriodBalance ProjectBid ProjectBid If this check box is selected, bids are published. ProjectCosts History If this check box is selected, the history data related to the project costs is published. Interim Results If this check box is selected, the interim results related the project costs are published. EAC Material If this check box is selected, the estimate at completion material data related to the project costs is published. EAC Labor If this check box is selected, the estimate at completion labor data related to the project costs is published. EAC Equipment If this check box is selected, the estimate at completion equipment data related to the project costs is published. EAC Subcontracting If this check box is selected, the estimate at completion subcontracting data related to the project costs is published. EAC Sundry If this check box is selected, the estimate at completion sundry costs related to the project costs are published. ProjectEstimate ProjectEstimate If this check box is selected, estimates are published ProjectRevenue I Manual If this check box is selected, the manually specified project revenues are published. History If this check box is selected, the history data related project revenues is published. Interim Results If this check box is selected, the interim results related to the project revenues are published. ProjectRevenue II Advance Payment Request If this check box is selected, the advance payment requests related to the project revenues are published. Installment If this check box is selected, the installments related to the project revenues are published. Installment Extra Work If this check box is selected, the extra work of the installments related to the project revenues is published. Holdback If this check box is selected, the holdbacks related to the project revenues is published. Fees If this check box is selected, the contract fee related to the project revenues are published. Progress Payment Request If this check box is selected, the progress payment requests related to the project revenues are published. Delivery Based If this check box is selected, the delivery based invoices related to the project revenues are published. ProjectBudget ProjectBudget If this check box is selected, project budgets are published. ProjectProgress ProjectProgress If this check box is selected, project activity progress is published. Progress is retrieved from the Activity Physical Progress (tpppc1560m000) session. ProjectContract ProjectContract If this check box is selected, the contracts linked to the projects are published. The contracts are retrieved from the Contracts (tpctm1100m000) session. ProjectContractDeliverable Label is set in script If this check box is selected, the contract deliverables related to the project are published. ProjectContractInstallment Label is set in script If this check box is selected, the contract installments related to the project are published. Specific LnUserDefinedStructure If this check box is selected, the user defined structure related to the project is published. Label is set in script If this check box is selected, the billing cycle of the contract related to the project is published.
Process Processes the publishing of Infor LN Project data to Infor ION.
| |||