Subcontracted Operations (tisfc2110m000)

Use this session to display subcontracted operations by production order.

You can either plan to subcontract operations when you define the operations' routing, or you can decide to subcontract an operation later, in the Subcontract Operations (tisfc2210m000) session.

 

Production Order

The order number of the subcontracted operation.

Production Order Status

The order status of the production order.

Allowed values

Order Status

Subcontractor

A business partner that is hired to perform certain services, such as the execution of a part of a project or production order. The services are delivered via a purchase order.

Item

The end item of the production order.

Project (PCS)

The project that the production order is part of.

Operation

The sequence number of the operation to be carried out by the subcontractor.

Operation Status

The status assigned to an operation. For example, Planned, Ready to Start, or Completed. This status indicates how far an operation has proceeded.

Allowed values

Possible values

Task

The task of the subcontracted operation.

Work Center

The subcontracting work center where the operation is performed.

Operation Text

If this check box is selected, a text is present for the production order operation, which is linked in the production planning.

Task Text

If this check box is selected, a text is present for the task, which is linked in the Tasks (tirou0103m000) session.

Subcontracting Document

The type of document that is linked to the subcontracting operation.

Remainder Start Date

The date you plan to start the operation, or if the operation has already been started, the date you plan to resume the operation.

You can choose whether LN uses the remaining order quantity or the hours already posted to calculate how much work has been carried out using the Calculation Method Remaining Production Time field in the Shop Floor Control Parameters (tisfc0100s000) session.

Move Start Date

The earliest date an operation can finish.

The move start date is calculated by subtracting the slack time from the number of days of the remaining production time after the start date remainder.

Quantity Planned Input

The quantity you plan to start the operation with, including the quantity reported completed and rejects.

If you alter the scrap or yield values, LN will recalculate this field, to keep the quantity planned output the same.

Quantity Planned Output

The quantity you plan to complete the operation with, which includes the quantity reported completed and the rejects.

Qty Returned from Subcontracting

The quantity that you have reported received from the subcontractor in the Purchase Order Lines (tdpur4101m000) session.

Subcontracting with Material Flow
Subassembly

An intermediary product in a production process that is not stored or sold as an end product, but that is passed on to the next operation.

For subcontracting purposes, a manufacturer can send a subassembly to a subcontractor to carry out work on the subassembly. This subassembly has its own item code defined in the Item Base Data.

After work is finished, the subcontractor sends the subassembly back to the manufacturer. Also this reworked subassembly has its own item code defined in the Item Base Data.

Subassembly Warehouse

The warehouse from which the subassembly is sent or in which the subassembly is received.

Purchase Document

The number of the subcontracting purchase document.

LN treats subcontracting as buying a service. You can generate subcontracting purchase orders or subcontracting purchase requisitions in the Generate Subcontracting Purchase Documents (tisfc2250m000) session.

Setup+Run Start Date

The date and time on which LN plans to start the operation.

If you alter the date and/or time of the Remainder Start Date field in the Production Planning (tisfc0110m000) session, LN recalculates the value of the Setup+Run Start Date field.

The start date of the operation is copied from planned production orders, which are generated in Enterprise Planning, when the orders are transferred from Enterprise Planning to Shop Floor Control.

If the production order is transferred from the Production Order Advice (whina3100m000) session in Warehousing, LN copies the start date of the operation from that session.

When you manually enter an order in the Production Orders (tisfc0101s000) session, LN calculates the value of the Setup+Run Start Date field using the lead-time elements of the operation that you specified in the Routing Operations (tirou1102m000) session.

Text

If this check box is selected, an operation text or a task text is present.

  • An operation text is linked in the production planning.
  • A task text is linked in the Tasks (tirou0103m000) session.

 

Print Subcontracted Operations by Subcontractor
Print Subcontracted Operations by Order
Generate Subcontracting Purchase Documents
Purchase Order
Purchase Requisition
Subcontracting Rates
Subcontract Operations
Production Planning