If this check box is selected, you can specify a range of order groups.
Print Material Shortages by Production Order (tisfc0419m000)Use this session to check whether the material that is required for production orders is available in time. Report The report displays the following symbols:
Selection Range SFC Order Group If this check box is selected, you can specify a range of order groups. SFC Order Group A collection of planned production orders, which you can use as a selection criterion to transfer planned production orders from Enterprise Planning to the Shop Floor Control module of Manufacturing. SFC can use the same collection of production orders to organize manufacturing tasks. Production Order An order to produce a specified quantity of an item on a specified delivery date. Project (PCS) A collection of manufacturing and purchasing actions that are performed especially for a particular customer order. A project is initiated by a customer order for items having a To Order order policy. The purpose of a project is to plan and coordinate the production of these items. For a standard-to-order production, the project is only used to link the item with the customer order. Otherwise, a project can include:
A budget is a special type of project. A budget is used to plan and estimate, not to carry out production. Production Start Date and Time The start date and time of the production order. Planner The employee or department responsible for planning the production, purchase and distribution of items. The planner takes into account the inventory levels, availability of materials, and capacities of resources, and reacts on signals such as rescheduling messages that LN generates. Shop Floor Planner The person responsible for printing, (re)scheduling and releasing production orders and managing workloads. Options Check Determines what kind of check this session performs. Allowed values
Scope Determines from which warehouses LN takes the available inventory into account. Allowed values
If the Check field is Multilevel, this field is Planned Warehouses in Cluster and cannot be changed. Skip Blocked Inventory If this check box is selected, LN does not take the inventory that is blocked into account for analyzing the production orders' material supply. Inventory can be blocked for inspection or for other reasons. Select this check box if you expect the material quality to be poor. If the Check field is Multilevel, this check box is automatically set the same as the Inventory In Inspection Available for Planning check box in the Inventory Handling Parameters (whinh0100m000) session and cannot be changed. Critical Items Only If this check box is selected, LN checks only the materials for which the Critical for Inventory Check check box in the Items - Production (tiipd0101m000) session is selected. Note If you check multilevel, and a material that is not critical has lower-level materials that are critical, LN will check these lower-level materials. Print Print Select the type of orders to be printed. Allowed values
Print Starts printing.
| |||||||