If this check box is selected, LN recalculates the
capacity utilization by deleting the existing data for the selected range and
recalculating the data. If you have selected Automatic in either the Update Method Week Utilization field or in the in the Update Method Day Utilization field in the Shop Floor Control Parameters (tisfc0100s000) session, LN calculates the
utilization until the end of the period.
If this check box is cleared, LN only recalculates the
capacity utilization for work centers and machines for which you have changed
the planning of orders. LN will only do this if you have selected Manual in either the Update Method Week Utilization field or in the in the Update Method Day Utilization field in the Shop Floor Control Parameters (tisfc0100s000) session.