| Budget Details (tipcs2140m000)Use this session to find or list budget details. In the details
session, you can maintain budget data that will be used to calculate the
budget. Note Enter a budget or
maintain general budget data in the Projects (tipcs2101m000) session. Budget A cost estimate in the preproduction stage of projects.
Includes an estimate of future costs and revenues related to expected
activities. A budget is linked to a calculation group. Budgets within the
same calculation group can therefore be used for simulation purposes. Budget Date The date on which the budget was entered. Material Prices Final If this check box is selected, the material prices are
included in the calculation. Operation Rates Final If this check box is selected, the operation rates for
the budget are calculated. Subcontracting Rates Final If this check box is selected, the subcontracting rates
of the budget are calculated. Budget Calculation Final If this check box is selected, the budget calculation
is finalized. Material prices, operation rates, and subcontracted rates are
included in the calculation. Last Calculation Date The date on which the budget was last calculated. Final Material Date The date on which the final calculation of the budget is
calculated. | |