Engineering Item RevisionTo define new revisions for an E-item in the Engineering Item Revision (tiedm1100m000) session, click the New button. You can insert multiple revisions that have the In-design status. You cannot insert a new revision if the previous revision is linked to an MBC, and EBOM changes have not yet been processed for that MBC. To select a different E-item for which you can define new revisions, click the Find a record button. The E-item must be defined in the Engineering Item (tiedm0110m000) session. If the revision is valid, it can affect a standard or customized item. The revision is valid if:
To delete a revision with In-design status, select the revision and then select Cancel Revision from the Edit menu. You cannot change the status to Approved by Engineering or Approved by Production if the revision is created by an MBC for which EBOM changes are not yet processed. Specific menu You can alter the status of an E-item revision in the Status field to:
You can also start the following sessions from the appropriate menu:
Reports If you click Print, you can select a session to produce reports about revisions:
| |||