To issue materials, strategiesMethods LN offers you various levels of control for the issue of materials. You can specify a different method for each material. Available methods to control the quantity of the issue:
Available methods to control the time of the issue. LN issues the material:
Special methods: Details of the methods to issue materials You can influence the issue process with parameters such as:
The Manual Issuing check box in the Shop Floor Control Parameters (tisfc0100s000) session influences the issuing process of all materials. Materials are issued when you choose the Initiate Inventory Issue command in the Material to Issue for Production Orders (ticst0101m100) session. For instructions about the use of these check boxes, see the Material issue parameters topic. For information about the methods to control the quantity and timing of material issues, see: Backflushing If you apply backflushing, LN issues the material when you report a quantity of the end product as completed or rejected. See Backflushing. Floor stock You can keep inexpensive materials present on the shop floor as floor stock. Floor stock is not allocated to a warehouse and is not included in material costs. To account for floor stock materials, a surcharge is added to the cost price of an end item. The supply of floor-stock items to the shop floor is triggered by Kanban. A warehousing order of the Production type can be created in which you determine from which warehouse and to what work center the material must be shipped.
| |||