| Possible valuesAll Available Lines All the PBOM lines are replaced by the EBOM lines and by
non-EBOM lines. The latter are lines from a standard PBOM that are copied to a
project (using the copy method NonProj Item to Proj Item in the EBOM Copy Data (tiedm1120m000) in the session). Only Corresponding Pos. Lines in the PBOM with the same position numbers as the EBOM
are replaced by the corresponding EBOM lines and non-EBOM lines. The other PBOM
lines remain unchanged. Corresp. and Linked Pos. The following lines in the PBOM are replaced by EBOM lines and
non-EBOM lines: - Lines in the PBOM that have the same numbers as EBOM
lines.
- Lines in the PBOM that have numbers that differ from the EBOM
line numbers, in which case the Link with EDM check box in the Bill of Material (tibom1110m000) session must be selected, and the numbers were created
by previous finalizing actions on the engineering data.
The other lines from the PBOM remain unchanged. These lines are
not engineering-related (for example, packing materials). In this way, you can
make a clear distinction in PBOMs between engineering-related components and
logistics components which do not relate to engineering.
| |