If this check box is selected, the effective dates of the BOM lines are checked to determine whether the BOM line's components are still valid and can be used in the manufactured item.
Check Planned by Planner Consistency (tibom1210m000)Use this session to update whether BOM lines are marked as Exploded by SCS Planner.
Check Effectivity against Date If this check box is selected, the effective dates of the BOM lines are checked to determine whether the BOM line's components are still valid and can be used in the manufactured item. Simulation Only If this check box is selected, the update of the consistency of the BOM explosion is only simulated, and no actual changes are made. This is useful when you just want to view the updates. A report is printed, which presents the simulation results. Check Effectivity against Date The date on which the effectivity of the BOM lines is checked.
Update If this check box is selected, BOM texts that have been recorded in the Generic BOMs (tipcf3110m000) session by component are printed.
| |||